Large undrilled IOCG copper target
Released
Released
Announcement PDF
ASX/Media Release
15th February 2016
Large undrilled IOCG copper target in
re-rated extensions to Olympic Dam belt
Maslins 6km x 1km gravity target well located 50km south of Carrapateena
In prospective IOCG corridor upgraded by breakthrough government geophysics
Depth to top of target modelled about 600m below surface under Stuart Shelf cover
Tenure granted and drilling to be proposed for next round of government PACE funding
Investigator Resources Limited (ASX: IVR) is pleased to report that a new large iron oxide copper gold
(IOCG or “Olympic Dam style”) target, “Maslins”, has been identified as a gravity anomaly situated 90km
northwest of Port Augusta in South Australia. Investigator applied for and has been granted Exploration
Licences in the area after innovative government surveys had refined the mapping of the Olympic Dam
IOCG belt. A geophysical corridor interpreted to be the underlying metal-rich source region extends
from Olympic Dam to Carrapateena and south onto the Maslins area close to road, rail and port
infrastructure (Figure 1). The Maslins target is located within Investigator’s tenement EL5705
“Whittata” held by IVR’s wholly-owned subsidiary Gawler Resources Pty Ltd.
Investigator Resources Managing Director John Anderson said “Recent state-wide government
surveying with a new geophysical approach has mapped a deep earth connection between the IOCG
deposits in the Olympic Dam belt that continues south of Carrapateena.
This gave Investigator confidence to seek undiscovered copper deposits along the revised southern
extensions, where mined copper deposits in the Stuart Shelf cover rocks provide further evidence of a
metal-pregnant district with IOCG potential in the underlying basement rocks.
Past IOCG exploration in the Maslins area is limited and had not drilled down to the target geology
that contains the local IOCG deposits. The nearest hole to test the target basement is 15 kilometres
away and this found the key IOCG indicators of breccia, haematite and copper mineralisation.
Pleasingly at Maslins, a relatively shallow gravity target has been modelled at the prospective
position with the size and density required of a new large IOCG system.
Such step-change opportunities are rare where new technology creates a significant revitalisation of
our ability to explore within a world-class minerals province. Investigator has grasped that
opportunity to participate in the next generation of major copper discoveries in the Gawler Craton.
The Maslins IOCG target will be proposed as a strong candidate for co-funding under the 2016 PACE
Collaborative Drill Program announced by the South Australian State Government in December.” Mr
Anderson added.
Investigator Resources Ltd
ABN 90 115 338 979
Tel: + 61 7 3870 0357
www.investres.com.au
PO Box 343, Toowong Q 4066
info@investres.com.au
ASX code: IVR
Page 1
ASX Release - IVR
Large undrilled IOCG copper target in re-rated extensions to Olympic Dam belt
15 February 2016
Background
As reported in the IVR ASX announcement of 20th October 2015, the preliminary data released for the
South Australian sector of the national AusLamp magneto-telluric (“MT”) survey were interpreted to
show a metal-source corridor at about 35km depth in the Gawler Craton connecting the IOCG deposits
from Prominent Hill through Olympic Dam and on to Carrapateena.
The corridor is interpreted to then extend south through the Stuart Shelf geological domain in the
Mount Gunson district (Figure 1) and onto the Uno Province where IVR has been focussing its
epithermal silver, porphyry copper and now Archaean nickel exploration. IVR responded by applying for
2,372km2 of new tenements in the Stuart Shelf district for the revitalised IOCG potential. The
exploration focus is the IOCG-prospective geological position in the top of the basement immediately
underlying the base of the Gawler Range Volcanics (“GRV”) (Figure 2).
A consultant, Hutchens Geophysics, was
engaged to work with the IVR team in
examining past drill and geophysical data to
assess the depth to the target basement
and to seek gravity and magnetic anomalies
as viable IOCG targets.
Of particular interest are uplifted horst
blocks as; a) conduits for fluid flow from the
deeper metal-source regions mapped by
the MT geophysics; and b) formation sites
for IOCG deposits. The giant Olympic Dam
IOCG deposit is interpreted to be on such a
geological horst block.
The dense source to the Maslins gravity
anomaly is modelled as the best and highly
warranted IOCG target recognised in IVR’s
ground thus far.
Potential is also envisaged for remobilised
copper deposits in structures and
unconformities through the younger cover
rocks on the Stuart Shelf (Figure 2). This
cover potential is also being assessed by
Investigator particularly for deeper deposits
that were not detectable by early explorers.
Figure 1:
Plan showing the location of the Maslins IOCG target
in relation to mineral deposits, the new MT corridor
and IVR tenements.
Investigator Resources Ltd
ABN 90 115 338 979
Tel: + 61 7 3870 0357
www.investres.com.au
PO Box 343, Toowong Q 4066
info@investres.com.au
ASX code: IVR
Page 2
ASX Release - IVR
Large undrilled IOCG copper target in re-rated extensions to Olympic Dam belt
15 February 2016
Favourable geological setting
Re-assessment of past drilling and the regional geophysical data indicates the Maslins target is situated
at a prospective location within a horst and adjacent to a prospective regional fault (Figure 2). The
Maslins anomaly is underlain by a broader Bouguer gravity anomaly of more than 15milligals amplitude
(Figure 3). This is interpreted to be a 20km x 25km triangular fault-bounded block of uplifted and altered
basement, named by IVR as the Whittata Block. The Maslins target lies on the western side of the block
adjacent to the NNW fault margin.
The model is supported by past drilling that is generally shallow and did not reach the target basement.
The regional NNW fault appears to have continued to move and act as a mineralising conduit during the
formation of the cover rocks. This is shown by the Pandurra Formation (brown in Figure 2) and Beda
Volcanics (green) both thinning out across the fault. Crosscutting NE faults offset the main NNW
structure, a common feature of prospective structures in the Gawler Craton. So the NNW fault has
potential to be the focus for both a) IOCG deposits at the top of the basement, and b) copper deposits
in the cover rocks as well.
SAR-8
500m
15km north of section
b) Continuing fluid flow
up reactivated fault forms
younger cover deposits
NNW
Fault
a) Uplifted horst
with fluid flow up
NNW fault forming
targeted “Maslins”
IOCG deposit at
top of basement
GRV
Brecciated, haematite
veined & pebbles of
basement
GRV
Haematitic breccia
Sporadic IOCG-style
skarn copper mineralisn.
Basement
Basement siltstone
5km
Figure 2: Maslins target setting: Interpreted regional section and targeting models for both a) IOCG and b) cover-hosted
copper deposits (blue ellipse). Note vertical scale exaggeration of 10x. A schematic drill log of 1981 hole
SAR-8 is also shown with supporting evidence for local prospective horsts & IOCG-mineralised basement
Note the 10x exaggerated vertical scale
Limited drilling by prior explorers was undertaken more than 8 years ago and generally did not test the
IOCG-prospective position at the top of the basement beneath the GRV. The closest holes to the Maslins
target, RCP1 & RCP2, were drilled in 2002 and only penetrated the top of the GRV without reaching the
modelled Maslins target (Figure 2).
The nearest hole to intersect the target basement was SAR-8 located 15km north of Maslins (Figures 1 &
2). SAR-8 demonstrated the right setting for IOCG deposits with the preferred basement host present
and the right mineralising processes operating in the broader Whittata block.
This hole reached the Wandearah Formation at 907m depth beneath a 632m thick interval of GRV. The
Wandearah siltstone is the preferred basement host for the local IOCG deposits. The top 100m of the
Investigator Resources Ltd
ABN 90 115 338 979
Tel: + 61 7 3870 0357
www.investres.com.au
PO Box 343, Toowong Q 4066
info@investres.com.au
ASX code: IVR
Page 3
ASX Release - IVR
Large undrilled IOCG copper target in re-rated extensions to Olympic Dam belt
15 February 2016
basement is brecciated and haematitic indicating preliminary IOCG processes were active in the right
geological position in the Whittata block.
The next 200m is also brecciated with sporadic IOCG-style skarn alteration, including diagnostic fluorite,
and copper mineralisation that is very encouraging for the prospectivity of the district.
Numerous narrow intervals of less than one metre intersected anomalous copper to 0.7% Cu as copper
sulphide (chalcopyrite) associated with lesser lead and zinc sulphides. An exception was one 30cm
interval assaying 15% copper. The geology in the bottom of the hole reverted to relatively unaltered and
unbrecciated siltstone from 1,218m to 1,338m.
As the SAR-8 geology is a very positive indicator for nearby IOCG deposits, the drill core has been has
been subject to study by the Geological Survey who provide density measurements down the hole. The
unmineralised basement siltstone has a density of 2.75grams per cubic centimetre (“g/cc”) whereas the
mineralised basement ranges up to but rarely above 3.0g/cc.
The position of SAR-8 in a weakly gravity anomalous part the Whittata block (Figure 4) suggests the
densities in SAR-8 represent the background values for the pervasive regional alteration in the block.
The higher density contrast modelled in the Maslins target is encouraging for the interpretation of a
discrete more haematitic and better mineralised IOCG deposit.
The Maslins target also has an interpreted structural connection to the Punt Hill prospect about 20km
distance (Figure 4). Punt Hill also confirms IOCG-style activity on the apron of the wider Whittata block.
Figure 3: Bouguer gravity image for the Whittata gravity
block: Showing western bounding NNW fault & key drill
holes including SAR-8.
Figure 4: Residual gravity image
Filtered Bouguer gravity showing discrete dense anomalies
including the Maslins target.
Punt Hill
Punt Hill
SAR-8
SAR-8
Whittata Block
Target
EL5705
RCP2
RCP1
Maslins Target
Maslins Target
5km
Investigator Resources Ltd
ABN 90 115 338 979
Tel: + 61 7 3870 0357
www.investres.com.au
PO Box 343, Toowong Q 4066
info@investres.com.au
ASX code: IVR
Page 4
ASX Release - IVR
Large undrilled IOCG copper target in re-rated extensions to Olympic Dam belt
15 February 2016
SAR-8 also supports the local presence of uplifted basement at about 600m below the current surface
as proposed at Maslins. The company that drilled the hole reported a 40m interval of brecciation and
haematite veining in the GRV at that level (Figure 2). This interval also contains rounded basement
pebbles indicating erosion of a higher basement outcrop with the proximal Maslins horst being a
possible candidate. This evidence in SAR-08 of uplift, brecciation and haematite alteration during the
mid-GRV may be a regional geological record of the IOCG mega-event in the Gawler Craton.
Maslins Target
Maslins is a robust geophysical target with an appropriate density, shape and structural position to be a
valid IOCG system. The Maslins target model is shown in Figures 5 & 6 including two indicative tests of
1,000m deep vertical holes.
Processing and filtering of the existing geophysical data delineated the Maslins target as a residual
gravity anomaly situated around the edge of the larger Whittata block of prospective basement (Figure
5). A deep magnetic feature underlies the Maslins target (Figure 6) in keeping with the standard IOCG
target model.
The Maslins body is modelled as a sub-horizontal cylindrical body with dimensions of 6km length x 1km
diameter and a strong density contrast of 0.4g/cc to 0.53g/cc. The shallowest modelled top is at 600m
depth beneath the surface with the centre of the modelled body situated at about 1,200m depth.
Figure 5: Plan showing the top view of the Maslins target
Modelled on the residual gravity anomaly after the regional
feature is removed. Showing indicative drill tests as black
dots and interpreted structures at horst & block margins.
Figure 6: 3-D model of Maslins gravity target
Viewed from the south end. The gravity contrast shells
are orange to red with the outer shell being 0.4g/cc and
the inner red shell being 0.5g/cc. The modelled upper
surface of a magnetic body is shown in blue. Also
showing two indicative vertical drill tests from surface
to 1,000m depth.
Punt Hill
Indicative test hole A
SAR-8
B
500m
Approximate
foreground
scale
500m
RCP2
RCP1
Indicative test holes B
A
Maslins Target
Investigator Resources Ltd
ABN 90 115 338 979
Tel: + 61 7 3870 0357
www.investres.com.au
PO Box 343, Toowong Q 4066
info@investres.com.au
ASX code: IVR
Page 5
ASX Release - IVR
Large undrilled IOCG copper target in re-rated extensions to Olympic Dam belt
15 February 2016
Target Prognosis
Maslins is a high-priority IOCG target in an under-explored and revitalised extension to the Olympic Dam
IOCG belt.
The target has several attributes that strongly support the IOCG copper potential of the target: size and density;
shape and structural position along the margin of an interpreted horst block;
favourable geological position beneath the GRV; and
the right basement rocks, brecciation and mineralising processes demonstrated by the nearest
deep hole about 15km away.
The thickness of the GRV over the Maslins target is not constrained by drilling. There is a possibility the
Maslins gravity anomaly is caused by a non-economic dense volcanic at the base of the GRV. However,
this is not supported by the shape and structural position of the Maslins target and the lack of dense
volcanics at the bottom of the GRV in hole SAR-8.
The large size of the Maslins target offers potential for a giant deposit that may offset any depth issues.
Another positive attribute is the southern location placing the target closer to road, rail and port
infrastructure than established copper operations in the belt.
The target will be submitted for PACE co-funding support by the South Australian State Government.
Two possible 1,000m holes are indicated in Figures 5 and 6. After a preliminary government
announcement in December, the launch of the 2016 collaborative drilling scheme is anticipated soon
with co-funding grants awarded around mid-year.
For further information contact:
Mr John Anderson
Managing Director
Investigator Resources Limited
Phone: 07 3870 0357
Web: www.investres.com.au
Investigator Resources overview
Investigator Resources Limited (ASX code: IVR) is a metals explorer with a focus on the opportunities for
greenfields silver-lead, copper-gold and nickel discoveries offered by the resurging minerals frontier of
the southern Gawler Craton on South Australia’s northern Eyre and Yorke Peninsulas.
The Company announced a revised upward estimation for the Paris Silver Project Inferred Mineral
Resource for its 2011 Paris silver discovery to 8.8Mt at 116g/t silver, containing 33Moz silver (at a 50g/t
silver cut-off) in November 2015.
The Company has applied a consistent and innovative strategy that has developed multiple ideas and
quality targets that has given Investigator first-mover status. These include the Paris silver discovery,
the recognition of other epithermal fields and the associated conceptual potential for porphyry copper
of Olympic Dam age, along with the possibility of Archaean nickel in the underlying basement.
Investigator Resources Ltd
ABN 90 115 338 979
Tel: + 61 7 3870 0357
www.investres.com.au
PO Box 343, Toowong Q 4066
info@investres.com.au
ASX code: IVR
Page 6
ASX Release - IVR
Large undrilled IOCG copper target in re-rated extensions to Olympic Dam belt
15 February 2016
Competent Person Compliance Statement
The information in this presentation relating to exploration results is based on information compiled by
Mr. John Anderson who is a full time employee of the company. Mr. Anderson is a member of the
Australasian Institute of Mining and Metallurgy. Mr. Anderson has sufficient experience of relevance to
the styles of mineralisation and the types of deposits under consideration, and to the activities
undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves
Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves. Mr. Anderson consents to the inclusion in this report of the matters based on information in
the form and context in which it appears.
The information in this presentation that relates to Mineral Resources Estimates at the Paris Silver
Project is extracted from the report entitled “Upgraded Paris resource estimate: 60% increase to 33Moz
silver” dated 9 November 2015 and is available to view on the Company website
www.investres.com.au. The Company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcement and that all material
assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed. The company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially
modified from the original market announcement.
Investigator Resources Ltd
ABN 90 115 338 979
Tel: + 61 7 3870 0357
www.investres.com.au
PO Box 343, Toowong Q 4066
info@investres.com.au
ASX code: IVR
Page 7
ASX Release - IVR
Large undrilled IOCG copper target in re-rated extensions to Olympic Dam belt
15 February 2016
APPENDIX 1
TABLE 1: MASLINS PROJECT (EL5704, EL5705, EL5706 and ELA198/15) GRAVITY AND MAGNETIC RESULTS
REPORTING FEBRUARY 2016 - JORC 2012
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
The data used was not collected by Investigator Resources Ltd
(“IVR”).
Drillhole data was sourced from South Australian Resources
Information Geoserver (“SARIG”) and open-file envelopes relating to
historic tenements. The data is historical, collected by previous
explorers.
Geophysical Data (gravity and magnetic data) was sourced from
SARIG and from open file envelopes relating to historic tenements.
The data is historical, collected by previous explorers.
After the IVR QA/QC process, a total of 7,179 gravity readings were
used.
This data is sourced from ten surveys. Six of the survey data sets are
available for download from the SARIG website, and four data sets
were sourced from open files that had not yet been added to the
SARIG geophysical database.
A total of four aeromagnetic surveys were stitched for a total of
3.75million data points, with all four surveys having been flown at
400m line-spacing, E-W orientation and 80m terrain clearance.
Due to the historical nature of the data, no information is presented
on the types of measuring equipment used.
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘RC drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed information.
Drilling
techniques
Drill sample
recovery
Drill type (e.g. core, RC, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc.) and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether
core is oriented and if so, by what method, etc.).
Method of recording and assessing core and chip sample recoveries
and results assessed.
Investigator Resources Ltd
ABN 90 115 338 979
Tel: + 61 7 3870 0357
www.investres.com.au
PO Box 343, Toowong Q 4066
info@investres.com.au
No drilling was conducted or reported as part of this release.
No drilling or sampling was conducted or reported as part of this
release.
ASX code: IVR
Page 8
ASX Release - IVR
Criteria
Large undrilled IOCG copper target in re-rated extensions to Olympic Dam belt
JORC Code explanation
15 February 2016
Commentary
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Logging
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
No drilling, logging or sampling was conducted or reported as part of
this release.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc.) photography.
Subsampling
techniques
and sample
preparation
The total length and percentage of the relevant intersections logged.
If core, whether cut or sawn and whether quarter, half or all core
taken.
No sampling was conducted or reported as part of this release.
If non-core, whether riffled, tube sampled, rotary split, etc. and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Quality of
assay data
and
laboratory
Whether sample sizes are appropriate to the grain size of the material
being sampled.
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
Investigator Resources Ltd
ABN 90 115 338 979
Tel: + 61 7 3870 0357
www.investres.com.au
PO Box 343, Toowong Q 4066
info@investres.com.au
No sampling or assaying was conducted or reported as part of this
release.
Gravity data was sourced from SARIG and from open file envelopes
relating to historic tenements. The data was initially selected within a
ASX code: IVR
Page 9
ASX Release - IVR
Large undrilled IOCG copper target in re-rated extensions to Olympic Dam belt
Criteria
JORC Code explanation
tests
For geophysical tools, spectrometers, handheld XRF instruments,
etc., the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
Commentary
Nature of quality control procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (i.e. lack of bias) and precision have been established.
Verification
of sampling
and
assaying
15 February 2016
The verification of significant intersections by either independent or
alternative company personnel.
rectangular area which was then trimmed to better fit the IVR project
area. A total of 37 surveys were initially sourced.
Once the data had been downloaded from SARIG, it was broken into
individual surveys for initial QA/QC. The surveys that were not
collected on regular grids/lines were discarded as were surveys that
were significantly outside the IVR tenements or had very few points.
In all 24 surveys were excluded at this point.
The following corrections were made:
- All location data was then converted to GDA94, Zone 53.
- Convert geoidal elevations (AHD) to ellipsoidal elevations
(GDA94).
- Latitude Correction (theoretical ellipsoidal gravity).
- Free Air Correction.
- Bouguer Correction
Calculated Bouguer Anomaly.
Gravity data was then analysed to detect inconsistencies and data
mis-matches within and between datasets.
Another three surveys were rejected after QA/QC analysis, as being
inconsistent, leaving a total of ten surveys.
Information on type and accuracy of the location data is not available.
It has been assumed that the locational data for these ten surveys are
correct.
Aeromagnetic data was sourced from four surveys, all flown for
TEISA or SAEI. QA/QC of the data consisted of analysing the areas
of overlap from the surveys and comparing the data histograms
between the surveys. A good match was found between the surveys
and a constant value was calculated as a shift for each survey to level
between surveys. The overlapping data was then removed and the
individual surveys combined to produce a single dataset.
No sampling or assaying was conducted or reported as part of this
release.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Investigator Resources Ltd
ABN 90 115 338 979
Tel: + 61 7 3870 0357
www.investres.com.au
PO Box 343, Toowong Q 4066
info@investres.com.au
ASX code: IVR
Page 10
ASX Release - IVR
Large undrilled IOCG copper target in re-rated extensions to Olympic Dam belt
Criteria
JORC Code explanation
Location of
data points
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
Commentary
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been applied.
Orientation
of data in
relation to
geological
structure
Sample
security
Audits or
reviews
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
The measures taken to ensure sample security.
The results of any audits or reviews of sampling techniques and data.
Investigator Resources Ltd
ABN 90 115 338 979
Tel: + 61 7 3870 0357
www.investres.com.au
15 February 2016
PO Box 343, Toowong Q 4066
info@investres.com.au
The data used was not collected by IVR.
Data was sourced from SARIG and from open file envelopes relating
to historic tenements.
The data was historical, collected by previous explorers.
The gravity data is sourced from ten surveys, six of the survey data
sets are available for download from the SARIG website, and four
data sets were sourced from open files.
The aeromagnetic data has been sourced from SARIG and consists
of four separate surveys, however they were all flown with the same
flight parameters and stitching of the datasets was relatively straight
forward.
Compiled gravity data is of highly variable grid spacing, from 250m to
2km, depending on the original survey parameters and the degree of
overlap of the different surveys.
The overall spacing of the gravity stations is considered more than
adequate for first-pass surveying, with the detailed areas having
sufficient detail to allow structural interpretation and targeting.
The stitched aeromag surveys are all at 400m line-spacing and 80m
terrain clearance. This is considered as adequate for exploration for
large, deep targets.
The use of regular-spaced grids eliminates any potential bias that
could be caused by the use of obliquely-biased grids.
No sampling or assaying was conducted or reported as part of this
release.
QA/QC analysis was conducted on all gravity data to eliminate
inconsistent datasets. Of the original 37 datasets considered, a total
of ten were used, as the other 27 datasets were considered to be
either irrelevant to the project (significantly outside of the tenement
package) or inconsistent or with irreconcilable errors.
ASX code: IVR
Page 11
ASX Release - IVR
Large undrilled IOCG copper target in re-rated extensions to Olympic Dam belt
15 February 2016
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
All results accompanying this Table 1 are derived from within granted
Exploration Licences: EL5704 (Yalymboo-Oakden Hills), EL5705
(Whittata) EL5706 (Yudnapinna) and exploration licence application,
ELA198/15 (Birthday), collectively referred to as the ‘Maslins Project’.
The Maslins Project licences
Share your feedback
Discover