Investor Update
Released
Released
Announcement PDF
Thinking Silver? Think Investigator.
Australia’s exciting Silver story.
Investor Update
8 May 2025
ASX:IVR
Disclaimer
The information in this presentation is published to inform you about Investigator Resources Limited and its activities. Some statements in this presentation regarding estimates
or future events are forward looking statements. They involve risk and uncertainties that could cause actual results to differ from estimated results. All reasonable effort has
been made to provide accurate information, but we do not warrant or represent its accuracy and we reserve the right to make changes to it at any time without notice.
To the extent permitted by law, Investigator Resources Limited accepts no responsibility or liability for any losses or damages of any kind arising out of the use of any
information contained in this presentation. Recipients should make their own enquiries in relation to any investment decisions.
Competent Person Statements
The information in this presentation relating to exploration results is based on information compiled by Mr Jason Murray who is a full time employee of Investigator Resources
Limited. Mr Murray is a member of the Australasian Institute of Mining and Metallurgy. Mr Murray has sufficient experience of relevance to the styles of mineralisation and the
types of deposits under consideration, and to the activities undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee
(JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Murray consents to the inclusion in this report of the matters based on
information in the form and context in which it appears.
The information in this presentation that relates to Mineral Resources Estimates at the Paris Silver Project is extracted from the release titled “Paris Mineral Resource Estimate
Update” dated 5 July 2023 and is available to view on the Company’s website www.investres.com.au. The Company confirms that it is not aware of any new information or data
that materially affects the information included in the original market announcement and that all material assumptions and technical parameters underpinning the estimates in
the relevant market announcement continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the original market announcement.
The information in this presentation that relates to Pre-Feasibility Study undertaken on the Paris Silver Project is extracted from the release titled “Paris PFS Delivers Outstanding
Results” dated 30 November 2021 and is available to view on the Company’s website www.investres.com.au. The Company confirms that it is not aware of any new information
or data that materially affects the information included in the original market announcement and that all material assumptions and technical parameters underpinning the results
in the relevant market announcement continue to apply and have not materially changed.
The information in this presentation that relates to Mineral Resources Estimates at the Molyhil Tungsten/Molybdenum Project is extracted from the release titled “Updated
Molyhil Mineral Resource Estimate Update” dated 28 May 2024 and is available to view on the Company’s website www.investres.com.au. The Company confirms that it is not
aware of any new information or data that materially affects the information included in the original market announcement and that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The company confirms that the form and
context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
Investigator Resources Limited – May 2025
2
What you really need to know about Investigator.….
Capital – 31 March 2025
$0.07
$35.00
$0.06
$0.05
$30.00
Shares – ordinary
1,589M
Listed Options (4.2c, exp Mar 2028)
381M
Unlisted Options (7.6c, exp Dec 2025)
26.5M
Share Price
2.4c
Market Cap
$38M
Cash (March 31 2025)
$1.9M
$0.04
IVR (A$/sh)
Share Register – 31 December 2024
$0.02
$20.00
$0.01
IVR (A$/sh)
Silver (U$)
$0.00
Mar 2024
May 2024
Investigator Resources Limited – May 2025
Jul 2024
Sep 2024
Nov 2024
Jan 2025
$15.00
Mar 2025
Silver (US$/oz)
$25.00
$0.03
Jupiter Asset Management
15.13%
Top 20
30%
# Shareholders
5,437
Board and Management
Richard Hillis
Non-Executive Chair
Andrew Shearer
Managing Director (interim
Andrew McIlwain
Executive Director
Lachlan Wallace
Managing Director, effective 1st July 2025
3
What else do you need to know about Silver*……?
Photovoltaic
8%
Both a precious and an industrial metal
•
Traditional store of wealth
•
Most electrically conductive metal
•
•
Etylene Oxide
5%
Brazing / Alloys
4%
Other Industrials
14%
Circuit boards, semiconductors
Photo voltaic (PV) – every solar panel needs ~1oz Ag
•
194M oz in 2023 – up from 118M oz in 2022
•
Electric vehicles (EV) contain ~2oz Ag
•
85% global Ag reserves forecast to be consumed by 2050
•
Mexico & Peru:
•
•
Photography
3%
Jewellery
25%
Coins / Bars
20%
lowest production in 14 years, down 25% in last 8 years
Global demand outstripping production
Eletronics
21%
Source: https://www.miningvisuals.com/post/silver-demand-nearly-20-of-global-demand-tied-to-photovoltaics-by-2024
Decarbonisation and electrification of the world depends on silver….
Investigator Resources Limited – May 2025
* The Silver Institute
4
What do you need to know about Investigator?
South Australia focus
• Paris Silver Project
•
Australia’s highest grade primary Silver project
•
57Moz Silver + 99kt Lead - JORC (2012) Resource #1
•
PFS completed 2021
•
Resource updated July 2023
•
DFS in progress
• Uno/Morgans exploration tenements
•
80km east of Paris - base & precious metals
• Curnamona - Copper/Gold/Silver prospectivity
Molyhil Tungsten Project (NT) – 25% JV
#1 – As announced to the ASX 5 July 2022
Investigator Resources Limited – May 2025
5
Investigator Resources Limited – May 2025
6
Paris Silver Project – 100% IVR
Pre Tax NPV8:
A$202 Million
IRR:
47.9%
Project Life
7 years
Capex
A$131 Million
LOM Free Cash (Pre Tax)
A$487 Million
Pre-Feasibility Study#2
Paris – the highest grade undeveloped primary silver
project in Australia
• Simple open pit – 70% free dig
• Dry stacked tailings
• Hybrid diesel & solar power generation
• PFS results based on silver recovery only
• Base case Ag price - A$34.30/oz
• AISC of A$17.45/oz
• Zero contribution from lead (99kt in resource)
AISC:
A$17.45/oz
Investigator Resources Limited – May 2025
#2 – PFS results as released to ASX on 30 Nov 2021
7
Paris Silver Project – Definitive Feasibility Study
• Southern resource extension
• Metallurgical optimisation
•
Crush, grind and Lead recovery test work
•
Final Silver leach studies – incl tails & detox
• Hydrological study – pit & process water
• Environmental survey
• Engagement with SA regulators
• Mine optimisation, design and costing
• DFS – 2H 2025
• Regulatory approvals:
•
Mining lease application
•
Environmental permit (PEPR)
•
Native Title Mining Agreement (NTMA)
Investigator Resources Limited – May 2025
8
Recent exploration program within 5km of Paris
Recent Exploration highlights extend Paris silver corridor over 15kms and
include:
Perseus Prospect (2km from Paris)
•
•
•
•
1m @ 71g/t silver & 0.6% Pb from 38m (PLAC161) #3
9m @ 21g/t silver from 114m (PPRC907) #2
1m @ 1.37g/t gold from 40m (PPRC905)
42m @ 0.28% lead and 48m @ 0.56% zinc from 51m (incl 3m @ 1% Zinc from
78m) (PPRC901)
• 7m @ 0.35% lead from 174m and 19m @ 1% zinc from 162m (incl 5m @ 3% zinc
from 171m) (PPRC910)
Manto prospect (5 km from Paris)
• 3m @ 31g/t from 105m (PLAC284) #4
• 3m @ 86g/t silver from 90m, including 1m @ 218g/t silver from 91m #5
Apollo prospect
• 8m @ 1,262g/t Ag from 149m #5
• Mineralogically identical to Paris
Results continue to indicate favorable geology at new prospects and evidence
of a siler/lead/zinc mineralised system.
# 3 – As released to ASX on 30 May 2024
# 2 - As reported to ASX 23 October 2024 – IVR Quarterly Activities Report
# 4 - As reported to ASX 31 March 2025 – Drilling Results from greater Paris silver project
# 5 – As released to ASX on 25 Aug 2022
Figure 2: Drill collars over Band Pass filtered Magnetic RTP imagery.
Investigator Resources Limited – May 2025
9
Black Hill Project Joint Venture
Farm-In Agreement with Alliance Resources on adjacent high grade silver
prospect #6
In 2013 Trafford re-assayed selected intervals from 2012 drilling as prior
analysis focussed on iron ore.
Highlights included:
• 5m @ 493g/t silver between 71 and 76m and
• 3m @ 71g/t silver between 82 and 85m (12BWRC0205m).
Additional intervals from 12BWRC020 were sent for analysis, however no
further reporting of results occurred.
Post 2014 Trafford’s corporate strategy shifted from the area with no further
follow up drilling undertaken.
Other silver hits reported in the region
Earn-in agreement, with no cash to Alliance
Desk top review commencing now, re assay and relogging
First field work May, geological mapping
#6 – As released to the ASX on 1/04/2025
Paris Silver Corridor extends from Apollo to ne Sunday iron Prospect.
Image: Drill collars and prospects over Band Pass filtered Magnetic RTP imagery.
Investigator Resources Limited – May 2025
10
Investigator – SA Regional Opportunities
Uno Morgans tenements: 80km east of Paris….
• Similar structural/geologic setting to Paris
• Silver, Gold & Base metal potential
• 24 of 27 holes intersected mineralisation#6
•
12m @ 240g/t silver from 78m (12 Mile)
•
123m @ 0.48% zinc from 15m (Uno Nth)
• Further drilling planned for 2025
#6 – As released to the ASX on 7 July 2022
Investigator Resources Limited – May 2025
11
Investigator – SA Regional Opportunities
Curnamona: SA / NSW border
•
•
•
•
Targeting copper and gold
Historical gold and copper mining
Magnetics, gravity, IP and soil surveys done
Drilling planned 2025
Coincident gravity, magnetic and IP targets at Curnamona Project.
Image: Band pass filtered gravity data, with new IP traverses shown in pink.
Inset: Regional historic RTP 1VD magnetic intensity image, showing large magnetic feature within tenement
Investigator Resources Limited – May 2025
Curnamona Project Area
Members of the heritage clearance survey on location at the Tombstone project.
12
Diversification – Molyhil Tungsten/Molybdenum Project - NT
•
•
3 stage Earn-In to Joint Venture with Thor Energy (ASX:THR)
•
Stage 1 – completed – 25% JV interest (& 40% Bonya)
•
Stages 2 & 3 – further $7M over 6 years for 80%
JORC 2012 Mineral Resource Estimate #7
•
4.65Mt @ 0.26% WO3 and 12.1Kt @ 0.09% Mo for 12.1kt WO3 and 4.4kt Mo
•
Molyhil granted NT “Major Project” status
•
NT Collaborative Funding for 2023 gravity survey
•
Potential for NAIF, NT Jobs and Fed Critical Minerals funding
•
Key opportunities include:
•
Exploration growth
•
Open pit optimisation
•
Metallurgical process refinement
•
Tungsten and Molybdenum pricing
#7 – Reported to the ASX 28 May 2024
Investigator Resources Limited – May 2025
13
Investigator – The Value Proposition…….
• Silver exposure:
• Paris defined silver resource, advanced asset
• Robust project PFS financials, opportunities to enhance - DFS in progress
• Stable jurisdiction, clear pathway to approval, experienced team
• Regional exploration targets - potential to augment Paris
• Critical mineral exposure and diversification through Molyhil Tungsten Project
• Cash: ~$1.9M (31 March 2025)
• Continue to see a number of new business opportunities
• News flow:
• Curnamona drilling
• Sunday Iron Exploration
• Paris DFS
• Molyhil Tungsten Project drilling
• Exploration – Uno/Morgans
Investigator Resources Limited – May 2025
14
Thank you
Thinking Silver? Think Investigator.…
Investigator Resources Limited – May 2025
•
Andrew Shearer, Managing Director (interim)
•
47 King Street, Norwood SA 5067
•
+61 (0) 8 7325 2222
•
amcilwain@investres.com.au
•
www.investres.com.au
15
Appendix 1 – Paris Mineral Resource Estimate
#7
Category
Mt
Ag ppm
Pb %
Ag Mozs
Pb Kt
Indicated
17
75
0.5
41
85
Inferred
7.2
67
0.42
16
14
Total
24
73
0.41
57
99
Table 1: 2023 Paris Silver Project Mineral Resource estimate (25g/t silver cut-off grade).
(Note: Total values may differ due to minor rounding errors in the estimation process)
NOTE:
The information in this presentation that relates to Mineral Resources Estimates at the Paris Silver Project is extracted from the release titled “Paris Mineral Resource Estimate Update” dated 5 July 2023
and is available to view on the Company’s website www.investres.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the
original market announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially
changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
#7 – As released to the ASX on 5 July 2023
Investigator Resources Limited – May 2025
16
Appendix 2 – Molyhil Earn-In to JV Agreement
#8
General Terms
• 3 stage Earn-In to Joint Venture with Thor Mining (ASX:THR)
• Stage 1:
•
Payment to Thor of $100,000 on execution of Heads of Agreement documentation
•
Expenditure of $1M over 18 months (includes $100k HoA fee above) to earn a 25% interest in the Molyhil Tungsten Project and associated tenements, and all of
Molyhil’s 40% interest in the adjacent Bonya tenement (EL29107 in JV with Arafura (ASX:ARU))
•
If expenditure of $1M is not met within 18 months, balance to be paid to Thor
•
On formation of the Joint Venture (25:75 IVR:THR) IVR to issue Thor $250,000 in IVR shares (at the higher of 15-day VWAP or $0.05)
• Stage 2:
•
Expenditure of a further $2M over 3 years to earn a further 26% interest in the Molyhil Project and associated tenements (51:49 IVR:THR)
• Stage 3:
•
Expenditure of a further $5M over 3 years to earn a further 19% interest in the Molyhil Project and associated tenements (80:20 IVR:THR)
•
On formation of the 80:20 Joint Venture IVR to issue Thor $250,000 in IVR shares (at the higher of 15-day VWAP or $0.05)
• On formation of the 80:20 Joint Venture Thor can elect to contribute on a pro-rata basis or dilute. If diluted below
10% then Thor’s interest reverts to an NSR.
#8 – As released to the ASX on 24 November 2022
Investigator Resources Limited – May 2025
17
Appendix 3 – Molyhil Mineral Resource Estimate
0.05% WO3 cut-off to 150mRL
Category
Measured
Indicated
Inferred
Tonnes
1,160,000
1,664,000
1,823,000
Total
4,647,000
WO3
Grade % Tonnes
0.34
3,900
0.27
4,600
0.20
3,600
0.26
12,100
Mo
Grade % Tonnes
0.11
1,300
0.10
1,600
0.08
1,500
0.09
4,400
#9
Cu
Grade % Tonnes
0.06
700
0.05
800
0.03
550
0.04
2,050
Table 2: Molyhil Mineral Resource Estimate JORC (2012) classification as reported to the ASX by
Investigator 28 May 2024. Reported at a cut-off grade of 0.05% WO3 Tungsten and to 150mRL. Variability
of summation may occur due to rounding to appropriate level of significant figures.
NOTE:
The information in this presentation that relates to Mineral Resources Estimates at the Molyhil Tungsten/Molybdenum Project is extracted from the release titled “Updated Molyhil Mineral
Resource Estimate Update” dated 28 May 2024 and is available to view on the Company’s website www.investres.com.au. The Company confirms that it is not aware of any new information or
data that materially affects the information included in the original market announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not
been materially modified from the original market announcement.
#9– As released to the ASX 28 May 2024
Investigator Resources Limited – May 2025
18
Appendix 4 – Alliance Earn-In to JV Agreement
#9
Summary of Heads of Agreement Terms
•
· 3-Stage Earn-In to Joint Venture with Alliance:
Stage 1 – “Option Period”:
•
• Expenditure of $500k on in-ground exploration over 2 years before entering Stage 2.
•
• If $500k is not spent on in-ground exploration within 2 years, the agreement lapses.
•
• No project interest earned at the satisfactory completion of Stage 1.
Stage 2:
•
• Expenditure of a further $500k over a further 1 year to earn a 49% interest in the Joint Venture and before entering Stage 3.
•
• On formation of the 49:51 Joint Venture, Investigator to issue $500k worth of IVR shares at a 15 day VWAP.
•
• If the $500k is not spent on in-ground exploration within 1 year of the commence-ment of Stage 2, the agreement lapses.
Stage 3:
•
• From the completion of Stage 2, Investigator be solely responsible for funding all expenditure and development until the Joint Venture is awarded a mining or retention lease.
•
• Upon grant of the lease, Investigator will earn an additional 31% interest in the Joint Venture for a total of 80% Joint Venture interest.
•
• Following the commencement of Stage 3, Alliance has the right to sell its stake in the Joint Venture to Investigator at a value determined by an independent valuer mutually selected
by the parties.
•
• Consideration for the Alliance stake will be paid for through the issue of IVR shares (to a maximum of 15% of the Company) and any balance as a capped 1% NSR over production.
During the Earn-In period, Alliance must maintain the tenements in good standing.
Other terms and conditions of the Heads of Agreement are considered standard for this type of transaction.
#9 – As released to the ASX on 1 April 2025
Investigator Resources Limited – May 2025
19
Share your feedback
Discover