2024 Annual Report
Released
Released
Announcement PDF
Investigator Resources Limited
ABN 90 115 338 979
Annual Report - 30 June 2024
Investigator Resources Limited
Contents
30 June 2024
Corporate directory
Chair and Managing Director's Letter
Review of Operations
Directors' report
Auditor's independence declaration
Statement of profit or loss and other comprehensive income
Statement of financial position
Statement of changes in equity
Statement of cash flows
Notes to the financial statements
Consolidated entity disclosure statement
Directors' declaration
Independent auditor's report to the members of Investigator Resources Limited
Shareholder information
1
2
3
5
20
31
32
33
34
35
36
55
56
57
60
Investigator Resources Limited
Corporate directory
30 June 2024
Directors
Richard Hillis - Non-Executive Chair
Andrew McIlwain - Managing Director
Andrew Shearer - Non-Executive Director
Company Secretary
Anita Addorisio
Principal place of business
47 King Street
Norwood SA 5067
Share register
Computershare Limited
Level 5, 115 Grenfell Street
Adelaide SA 5000
Auditor
Grant Thornton Audit Pty Ltd
Level 3, 170 Frome Street
Adelaide SA 5000
Solicitors
Baker & McKenzie
L19, CBW, 181 William Street
Melbourne VIC 3000
Stock exchange listing
Investigator Resources Limited shares and options are listed on the Australian
Securities Exchange (ASX code: IVR and IVRO)
Website
www.investres.com.au
2
Investigator Resources Limited
Chair and Managing Director's Letter
30 June 2024
Dear Fellow Shareholder,
Welcome to the 2024 Annual Report for Investigator Resources Limited (Investigator, ASX: IVR). As every shareholder
would expect, your company’s focus during the year has been on the Definitive Feasibility Study (DFS) for our exciting
Paris Silver Project (Paris). We have worked diligently to detail and de-risk the operational and financial parameters for
Paris, as well as ensuring that value is added to Investigator’s exploration assets as they are advanced.
In the current challenging investment market for junior resource companies, our day-to-day share price does not always
reflect the efforts and achievements of the team. Nonetheless, we strongly believe that the future for Investigator, with
its significant exposure to the silver price, continues to be very positive.
The current silver price, and its future outlook merit comment. Silver is generally mined as a co-product of lead, zinc, or
other metals. Paris is a geologically unusual deposit in that the value of the ore lies predominantly in silver (approximately
90% by value), with relatively few other metals present and hence the value of Paris is highly leveraged to the silver
price. Historically high silver prices have been maintained over the past six months, with the fundamentals for the silver
price remaining strong, with demand exceeding supply every year since 2019. Increasing demand for silver is being
driven by the solar panel market, transition to electric vehicles, and computing hardware for AI. We believe these drivers
will continue into the future. The positive silver price outlook and its fundamentals strengthen our resolve to successfully
develop Paris.
Paris stands out as the highest grade undeveloped primary silver project in Australia. Key attributes include production
from a simple, shallow open pit, and a location where there is no conflicting land use or potential detrimental effects to
downstream water users, nor direct impact on communities. These attributes will facilitate the approval path for Paris,
unlike recently seen with mining projects in the eastern states.
Work on the DFS during the year has had many facets. Extensive additional drilling in the previous financial year
supported the updated Mineral Resource Estimate of 57Moz of silver and 99kt of lead delivered in July 2023. Other
tasks required for the DFS that have been completed during the year include the hydrological drilling and modelling
necessary to confirm an adequate source of water for processing, as well as the investigation of the behaviour of the
water table around the proposed Paris open pit as it is excavated.
The scope of work for the final engineering design of Paris was issued during the year and engineering consultancy
Mincore was engaged to complete the package of work associated with the process plant and associated infrastructure
design and capital and operating cost estimates. Environmental consulting group, JBS&G, undertook the environmental
survey in the field to update the previous baseline survey necessary to support project planning and approvals.
MinAssist, the mineral consulting group who led the PFS, continue to provide technical support and supervision,
particularly of the metallurgical test work and engineering design activities.
We had intended that the DFS would be released around the time of this Annual Report, but in order to ensure the best
and most robust possible analysis therein, we have run multiple optimisations for the mining and processing of the
deposit in the silver price and cost environment. This work has delayed its completion. The DFS is now scheduled to be
released in the coming December Quarter. Completion of the DFS will support the application to the South Australian
government for the granting of a mining licence and enable financing and development decisions to be made.
The identification of additional resources proximal to Paris would add further value to the project. With this objective, an
extensive exploration program was completed around Paris in the early part of 2024. The prospectivity of the area has
been enhanced by new discoveries at the Perseus and Manto prospects with follow up drilling currently underway.
Regional exploration has also been undertaken across South Australia at Uno Morgans and further afield in the
Curnamona. At Uno Morgans (approximately 100km east of Paris) the team have completed geophysics in preparation
for drilling, following up results reported in 2022 where 24 of 27 drill holes intersected mineralisation, including 12m @
240g/t silver from 78m and 128m @ 0.48% zinc from 15m.
3
Investigator Resources Limited
Chair and Managing Director's Letter
30 June 2024
During the year, Gold Road Resources, our joint venture partners in exploration in the Stuart Shelf, met the Stage 1
milestone and formed the 51:49 Joint Venture. Discover Co then acquired Gold Road’s interest in these tenements and
has delivered drill results such as 11m @ 1.2% copper. Subsequent to the end of FY23-24, we elected to sell our Joint
Venture interest and the adjacent Investigator-owned tenements to Discover Co for $1M cash and future royalties. The
sale provides additional cash for our core exploration and removes a significant expenditure commitment on 100%
owned Stuart Shelf tenements that were considered non-core to the company’s strategy.
As previously discussed, Investigator has continued to pursue diversification and value accretion through its Earn-In to
Joint Venture at the Molyhil Tungsten-Molybdenum Project in the Northern Territory. A targeted resource revalidation drill
program completed in late 2023 enabled an updated Mineral Resource Estimate to be released in May 2024 with a
significant improvement in the quantities of contained metal in the higher confidence resource categories. Subsequent
to the FY23-24 year end, with minimum Stage 1 commitments met, the 25% Joint Venture for the Molyhil Project was
formed with Thor Energy.
The NT Government renewed Molyhil’s Major Project status during the year, facilitating the project’s advancement amid
a global focus on tungsten as a critical mineral. Tungsten prices have increased significantly over the past decade. If
Chinese supply to the global tungsten market was restricted, as recently occurred with Chinese export controls applied
to antimony, tungsten prices would be likely to further increase.
We have many to thank for your company’s progress during the year. Firstly, Investigator’s own team and our contractors
who undertake extensive fieldwork in remote and challenging environments. They have done so whilst maintaining a
focus on on-the-job safety, minimising environmental impact and cost. Our achievement of another year with no reported
injuries is a credit to the entire team.
We collaborate extensively with South Australian and Northern Territory governments, and we thank the staff in those
authorities for their work with us.
Investigator considers respectful relationships with Traditional Owners and communities in our areas of operation as of
the highest priority. We endeavour, through continued engagement and information sharing, to work cooperatively and
respectfully with these communities and Traditional Owners. We seek to engage, build relationships, and generate
positive outcomes for all stakeholders.
We are conscious of, and recognise the continued support of our shareholders, particularly with the capital raising
undertaken in December 2023 and shareholder support of the SPP completed in early 2024. We have a very focused
approach to cash management and a key objective is to maximise ‘in-ground’ expenditure. As reported in the June 2024
Quarterly Report, Investigator held $4.5M cash on hand at the end of the 2024 Financial Year.
We thank you sincerely for your interest in and continued support of Investigator and look forward to enjoying future
successes with you. We look forward to the opportunity of meeting shareholders at this year’s Annual General Meeting
in Adelaide on Thursday 28th November.
Richard Hillis
Chair
Andrew McIlwain
Managing Director & CEO
4
Investigator Resources Limited
Review of Operations
30 June 2024
Paris Silver Project
The Company’s 100% owned Paris Silver Project is located approximately 70km north of the rural township of
Kimba on South Australia’s Eyre Peninsula. Access to the project site is predominantly via highways and sealed
roads and is approximately 7 hours by road from Adelaide, as can be seen in the figure below.
Figure 1: Locality map showing Investigator’s SA tenements and Paris Silver Project – approximately 535km by
road, NW of Adelaide (as at 30 June 2024). Note: Ownership of the Stuart Shelf JV changed to 51% Pernatty:49%
IVR post year end and as announced to the ASX 16 Sept 2024 IVR have agreed to sell its Stuart Shelf JV interests
and adjacent tenements.
The Paris Silver Project, Australia’s highest grade undeveloped primary silver project, hosts a JORC 2012
compliant Mineral Resource Estimate of 24Mt @ 73g/t silver and 0.41% lead for 57Mozs silver and 99kt lead at a
cut-off of 25g/t silver1, with 72% of the estimate within the Indicated classification category. The Paris resource is
a shallow, high-grade silver deposit amenable to simple open pit mining.
1 - As announced to the ASX on 5 July 2023
5
Investigator Resources Limited
Review of Operations
30 June 2024
Paris Mineral Resource Estimate
As announced to the ASX In July 2023, the Company released an updated Mineral Resource Estimate that
incorporated the additional drilling undertaken within a previously restricted and undrilled area at the southern end of
the Paris deposit. Access to this area was granted by the Gawler Ranges Aboriginal Corporation RNTBC (GRAC),
the Traditional Owners of the land on which Paris is located.
The 2023 updated Mineral Resource Estimate represents an approximate 7% increase in total silver ounces when
compared with the prior 2021 Mineral Resource Estimate. The 2023 Mineral Resource Estimate is shown in the table
below:
Tonnes
(million)
1.7
7.2
24
Ag
g/t
75
67
73
Pb
%
0.5
0.2
0.41
Indicated
Inferred
Total
Table 1: 2023 Paris Silver Project Mineral Resource Estimates2
Ag
moz
41
16
57
Pb
kt
85
14
99
Note:
Based on 25g/t silver cut-off grade.
Values may not sum due to rounding.
The Company confirms that it is not aware of any new information or data that materially affects the Paris Silver Project
Mineral Resource, since its release in July 2023.
Comparison between the 2021 and 2023 Mineral Resource Estimate are shown below, with the 73 additional holes
that were utilised in the 2023 resource estimates shown in yellow. Estimated tonnes increased with the additional
drilling, whilst ounces were increased by a combination of additional drilling, a reduction in cut-off grade, reflecting
improved commodity prices, and an increased cutoff depth of open pit mining assumptions.
The 2023 Mineral Resource Estimates saw an increase in the amount of higher confidence Indicated category of
resource converted.
2 - As announced to the ASX on 5 July 2023
6
Investigator Resources Limited
Review of Operations
30 June 2024
Figure 2: Collar plan showing location of the 73 new holes (yellow dots) over the 2021 Mineral Resource
Estimate classification block model, Indicated (red) and Inferred (blue).
Figure 3: Collar plan showing location of the 73 new holes (yellow dots) over the 2023 Mineral Resource
Estimate classification block model, Indicated (red) and Inferred (blue).
7
Investigator Resources Limited
Review of Operations
30 June 2024
The 2023 Paris Mineral Resource Estimate has formed the basis for work in undertaking a Definitive Feasibility
Study (DFS) which will allow assessment of the projects financial and operational viability and form the basis for
a transition into mine approvals for the project.
Paris Silver Project Definitive Feasibility Study
The 2021 Paris Pre-Feasibility Study (ASX 30 Nov 2021) highlighted the low-risk nature of the high-grade, near
surface, open pit project with the Base Case Scenario (“Whole of Ore Leach”) assuming a simple processing
circuit with robust silver recoveries. Notably, this Base Case contemplated only recovery of silver to dore, with no
revenue contribution from the substantial lead contained in the resource estimate included.
The current Definitive Feasibility Study was initiated on the back of the revised 2023 Paris Mineral Resource
Estimate and has focussed on improving confidence in a number of study areas, revisiting project economics in
light of current commodity prices and cost regimes in order to deliver a final project assessment. Enabling the
Board to assess the project’s viability in advance of development of a Mining Lease application as part of the
regulatory approvals process. Work in FY23-24 has included the following aspects:
Hydrological Modelling
During the period, in support of the completion of the Paris Definitive Feasibility Study, Investigator engaged a
consultant hydrologist to undertake hydrological modelling of the area surrounding the Paris project, in addition to
modelling of the Hector paleochannel, the potential source of process water identified to support the project.
The objectives of the modelling were to determine the amount and rate of dewatering of the Paris proposed open
pit, in addition to its potential to affect any potential groundwater dependent ecosystems in the broader region,
and determine at an initial level, the potential of the Hector water source to supply sufficient water for operational
requirements through the projected life of the project.
Results of modelling concluded that at the current level of study, the proposed Paris open pit could successfully
be dewatered, supporting the current geotechnical assumptions, with the water able to be utilised for mine
operations during the initial stages of operation. Modelling identified that drawdown from dewatering would not
impact on potentially groundwater dependent ecosystems located approximately 5km west of the project.
Results of modelling of the Hector water source also confirmed adequate water quantities to support the proposed
processing operations.
None of the water sources modelled have identified alternate water users and due to high salinity are unsuitable
for alternate uses amongst stakeholders.
A number of presentations of the modelling outputs occurred during the year with Department for Environment
and Water and Department for Energy and Mining hydrological regulator teams to ensure data and modelling
inputs were sufficient for assessment purposes. This consultative process has been very important to ensure that
information is sufficient not just for project knowledge, but to ensure a streamlined approvals process in the future.
Feedback from these regulatory groups, whilst supportive of presented information, identified a number of
additional requirements based around increasing knowledge of the broader hydrological conditions in addition to
some iterative modelling considerations. Investigator have developed a program of work which is designed to
efficiently and economically deliver the additional information necessary to support modelling from an “approvals”
perspective. This work was commenced in September 2024 and has included installation of additional PVC casing
on a selection of drill holes surrounding Paris to provide data on water levels. In addition, further Tromino passive
seismic surveying of the Hector paleochannel, combined with drill truthing and regional water level data collection
has been undertaken. This will allow iterative modelling to occur and address queries from regulators during the
consultation process to support future project approvals.
8
Investigator Resources Limited
Review of Operations
30 June 2024
Figure 4: Plan showing the location of the groundwater information wells at both Paris and Hector utilised for
hydrological modelling.
Metallurgical Testwork
A program focussed on assessment of the ability to recover lead as part of the Paris process flowsheet was
completed during the year. The 2021 PFS was based on a “silver only” recovery scenario, and as such, any value
add from lead was identified as a potential positive.
The lead test work supported the baseline production of a blended lead concentrate, with concentrate grades up
to 39% lead achieved from sulphide-rich zones. This outcome was encouraging and highlighted the capacity to
potentially recover sulphide lead alongside silver. Recoveries of up to 17% from lead oxide mineralisation were
achieved in testwork and reflected more challenging recoveries than that of sulphide flotation.
In order to incorporate lead into the Project’s process flowsheets and economic analyses the modelling of
distribution of lead sulphide versus transitional/oxide lead species within the deposit is required. This work is in
progress and if deemed practical will be incorporated into mine optimisation studies. The incorporation of economic
lead recovery into the Project’s flowsheet has the potential to improve the overall project value, offering a dual
revenue stream and potentially reducing overall project risk.
Engineering Design and Cost Estimation
Mincore, the Melbourne based Engineering, Procurement and Construction (EPC) consultancy group who
undertook engineering design and cost estimation for the Paris PFS in 2021 were appointed, following a
competitive tender process, to deliver key aspects of the Paris DFS study.
Work includes review of project aspects including process plant design and layout drawings, infrastructure
requirements and the delivery of utilities such as power and water. Capital cost estimates for the purchase,
construction and commissioning of the facilities, as well as planned operating costs, are also being developed by
Mincore.
9
Investigator Resources Limited
Review of Operations
30 June 2024
Mine Optimisation Strategic Alliance
Investigator entered into a strategic alliance with Golding Contractors Pty Ltd, a subsidiary of NRW Holdings, to
assist with mine design, scheduling and development costs for the Project. The partnership aims to work
collaboratively to optimise efficiencies and achieve lowest possible mining costs. Given a substantial percentage
of the orebody will be mined without the need for conventional drill and blast operations, equipment selection and
operating efficiencies are critical.
Golding’s engagement at this early stage is intended to allow development of mine plans, schedules and operating
strategies based on an optimal open pit design prepared by Investigator’s mining consultant.
In addition to planned mining activities, there is an opportunity for Golding to further optimise equipment and
personnel deployment through involvement in the early works needed for a greenfield development such as Paris,
including the construction of access roads, establishment of waste facilities and preparation of the process plant
area.
Costs associated with the work undertaken by Golding is accrued and not payable if Investigator enter into a
mining contract with Golding at the completion of the mine approvals process, and before January 2026. Should
Investigator not enter a mining contract at the time, the accrued costs become payable. The Strategic Alliance
does not preclude Investigator tendering the mining work to other contractors should Investigator and Golding be
unable to agree to terms.
Environmental Studies
JBS&G were appointed during the year as environmental consultants and have reviewed a range of environmental
and risk assessment reports as part of undertaking a gap analysis to ensure sufficient coverage of state and
Federal regulatory requirements is undertaken to support an approvals application.
During the period an additional ecological field survey was undertaken in order to build on prior baseline studies
and incorporate seasonal changes. The Flora study saw collection of data relevant to Federal and State Acts
including the Native Vegetation Act 1991 and Native Vegetation Regulations 2017. Additionally, any identified flora
species of National, State or local conservation significance were to be recorded, including any declared plants
under the Landscape South Australia Act 2016.
Fauna surveys were also undertaken and focussed on the habitat surrounding the Paris Project and access
corridors with ecologists documenting both feral and native species, with focussed attention on fauna that may
have national, state or local conservation significance.
Additional packages of work to complete the DFS have been undertaken in the period and include:
Engagement with the SA Department for Energy and Mining (DEM), designed to facilitate final project
approvals leading to Mining Lease establishment.
Environmental baseline soil testwork for approvals.
Sterilisation drilling of key infrastructure locations (process plant, waste dump etc).
Infrastructure corridor assessments.
Baseline noise surveying.
Engagement of experienced consultant for financial modelling of the Project’s economics.
Engagement with local and broader communities, as well as with the associated regulatory bodies also forms a
vital element of the DFS. Investigator recognises that best practice environmental management and strong support
from the community are critical to the Project’s success. During the DFS, particular attention will be given to water,
waste and emissions management.
The maximisation of engagement with local businesses and to consideration of employment opportunities for local
people is a mainstay of Investigator’s project development plan. Investigator has existing strong dealings with local
businesses developed during previous exploration activities, with a focus on utilising local suppliers where
possible.
Dialogue with GRAC, the Traditional Owners of the land on which Paris sits, will continue with the objective of
negotiating the Native Title Mining Agreement necessary for the production phase of the Paris Project. GRAC are
key stakeholders in the advancement of Paris, and it is intended that they will also be beneficiaries of the Project’s
successful development.
10
Investigator Resources Limited
Review of Operations
30 June 2024
It is anticipated that the Paris Silver Project’s Definitive Feasibility Study will be completed and announced to the
ASX prior to December 2024.
Regional Exploration on Peterlumbo Tenement
A significant and comprehensive work program focussed on the Peterlumbo Exploration Licence (hosting the Paris
silver deposit) was initiated in March 2024.
This program of work was multi-disciplinary and was aimed at employing and evaluating a variety of exploration
techniques within the proximity of the Paris deposit, with an ultimate objective of identifying prospectivity with
potential to broaden the Project’s resource base and enhance value through discovery of additional mineralisation.
A key component of the work program was the evaluation of methods that may allow cost effective and time
effective evaluation of basement depths, in order to rapidly target areas of increased alteration within volcanics
that may represent a Paris style target.
Exploration activities undertaken included:
Gravity Surveying – designed to expand existing coverage within the tenement and cover prospective areas.
Ultrafine Soil Sampling – a technique that has been successfully utilised elsewhere by Investigator, additional
Ultrafine Soil Sampling was employed over areas with limited prior sampling. Coverage in this program was at
100m x 100m spacings over selected areas (previously 500m x 500m), with infill focussed south and southeast of
Paris.
Ambient Noise Tomography (ANT) – a passive seismic survey technique, was undertaken over the broader
Apollo prospect located 5km northwest of Paris. An initial test of this geophysical method will be correlated with
existing drill information, gravity and magnetic geophysics. The survey area was chosen to evaluate this technique
based on deeper potential alteration related volcanics interpreted from existing gravity data. Seismic techniques
use velocity contrast between rock units to differentiate sequences in geological models.
Tromino “Passive Seismic” – a similar system to ANT, the Tromino method provides data immediately below
the deployed sensor and allowing features to be mapped based on differing physical properties. Tromino is more
of a “look down” technique, has rapid turnaround time and was tested as a potentially effective method to map
bedrock at a regional reconnaissance scale.
Air-Core Drilling - was employed using a highly manoeuvrable, low footprint drill rig mounted on a Toyota
Landcruiser and was undertaken as a test to rapidly evaluate target areas at minimum cost. With a lower overall
footprint and higher manoeuvrability, the air-core drilling allowed rapid sample generation from base of transported
cover in addition to a bedrock sample. The test program for this technique was designed around areas with no
previous drilling to test for alteration indicators recognised as being associated with Paris mineralisation, in addition
to regional geology. Approximately 5,000m in 120 holes was drilled in this program of work.
Results from this drilling were released to the ASX on 30 May 2024, with significant results noted below.
Two new prospects were generated from the Air-Core drilling program, one being the Perseus Prospect, located
approximately 2km south of the Paris deposit. A single hole drilled in the program at Perseus returned shallow
mineralisation of 1m @ 71g/t silver and 0.6% lead from 38m in PLAC161. This sample was the bottom of hole
sample in the hole. Petrology of drill chips from this interval confirmed the host sequence to be ignimbritic volcanic,
with evidence of hydrothermal silica alteration and observed native silver amongst other minerals identified.
The Manto Prospect located approximately 6km southeast of Paris, and on the southern margin of the Nankivel
intrusive complex saw initial drilling targeting a gravity low feature interpreted as associated with calc-silicate and
dolomite sequences. Drilling identified strong silica-sericite altered volcaniclastics interpreted to represent an
ignimbrite cover sequence with elevated zinc values including 5m @ 0.12% zinc from 44m in PLAC226 and
3m @ 0.1% copper and 0.1% nickel from 30m in hole PLAC229.
Other drilling at the Apollo prospect saw continued anomalous lead and zinc intersected including 2m @ 0.1%
lead and 0.2% zinc from 69m in PLAC258 within argillic altered metasediment. And drilling at the Diomedes
prospect saw continued interest most notably with PAC260 returning 36m @ 0.35% zinc from 8m and 20m @
0.4% lead from 7m in addition to hole PLAC259 returning 8m @ 0.7% lead and 0.16% zinc from 31m.
11
Investigator Resources Limited
Review of Operations
30 June 2024
Figure 5: Plan showing summary of exploration results from Air-Core drilling during the period.
Tromino passive seismic results were able to be reconciled with prior or recent drilling data and proved the method
to be effective as a low-cost reconnaissance survey method to map basement topography and cover sequence
thickness for targeting. The method has been employed and will be expanded particularly over areas where drill
data is of lower density to aid in interpretation of areas of potential greater alteration thickness, and to model
potential drill target depths in planning.
Soil geochemistry and ANT seismic modelling in addition to gravity modelling has progressed and will be
incorporated into future planning and target assessment.
12
Investigator Resources Limited
Review of Operations
30 June 2024
Other Tenements – South Australia
East Eyre
The Uno Range, Morgans and Harris Bluff and Corunna tenements, located approximately 80km to the east of,
and in a similar geological setting to Paris, saw continued renewed focus despite high activity on other projects
with additional infill ultrafine soil sampling over key areas within the Uno Range, Morgans and Harris Bluff
tenement, in addition to commencement of initial field work programs on the Corunna tenement which included
field mapping and ultrafine soil sampling activity.
Additional to this body of work, a program of gravity geophysical surveying covering the majority of the Uno Range,
Morgans and Harris Bluff areas of interest was undertaken during the year. Gravity has been an important
exploration tool at Peterlumbo, and with only regional gravity