OSM: Uranium Targets Defined at Fowler Project
Released
Released
Announcement PDF
ASX Announcement
21 February 2024
URANIUM TARGETS AND PALAEO-CHANNEL DEFINED AT
FOWLER PROJECT, SOUTH AUSTRALIA
HIGHLIGHTS
1B
•
Priority uranium target areas identified, including palaeo-channel margins as
defined from regional gravity data.
•
Weathered Hiltaba granites likely source for palaeo-channel Uranium.
•
Potential structure hosted primary mineralisation associated with Hiltaba
granites currently being reviewed.
•
Sampling and analysis of existing drill samples continuing.
•
Exploration programs for uranium are currently being defined for 2024.
Osmond Resources Limited (ASX:OSM) (Osmond or the Company) is pleased to announce
that following on from the discovery of significant uranium potential identified in historical
exploration reports at the Fowler Project (South Australia), the Company has identified a
laterally extensive area of channel margin prospective for uranium mineralisation within
tenement EL6004.
Osmond geologists have reviewed the open file gravity data, geological data and historical
drilling across the area to identify a proposed uranium target area. The geological model being
an inferred tidal marine/fluvial system around basement highs, including Hiltaba suite granites
and biotite gneiss (‘Hiltaba granites’). The Hiltaba granite intrusions, a likely source for the
uranium mineralisation, have a deep weathering profile that sheds and leaches uranium, under
oxidised conditions, into the adjacent palaeo-channels. Reduced facies with the palaeochannels trap the uranium mineralisation, particularly on the palaeo-channel margins where
redox boundaries are preserved.
Historical mineralised intercepts previously reported by Osmond (ASX Announcement
18 January 2024) reported that uranium values up to 300ppm exist within 30m of the surface
and along palae-channel margins. Palae-channel margins exceeding 90km of strike length
across Osmond tenements present an exciting exploration target.
Osmond Resources have recently engaged the native title holders, Far West Coast Aboriginal
Corporation (FWCAC), in access negotiations to meet Part 9B of the Mining Act requirements
to undertake exploration on the native title land. The FWCAC has recently negotiated a number
of mining and exploration access agreements and we expect to conclude an exploration
agreement by the middle of 2024, which will pave the way for on-ground exploration including
drill testing.
A significant amount of the historical data remains to be captured. For example, historical
drilling in the area targeted mainly mineral sands and limited lignite exploration, with no assays
for uranium undertaken. Any significant reported gamma intercepts reported from the existing
drill holes, that are coincident with Osmond’s proposed paleo-channel model will be reviewed
at the South Australian core library for sampling and assay.
Osmond Resources Ltd | ABN 96 649 477 | www.osmondresources.com.au |ASX:OSM
Level 2, 480 Collins Street, Melbourne VIC 3000 |T +61 3 9614 0600 | info@osmondresources.com.au
Other prospective targets for consideration are basement hosted uranium mineralisation along
major polyphase regional structures with the interaction of hot Hiltaba granite intrusions and
older biotite gneisses and ultra mafic intrusions.
Next steps
• Osmond geologists to resample historical drill holes for chemical assay for uranium and
rare earths elements.
• Complete historical review of all known holes including heavy mineral sand drill holes
• Ongoing 9B native title access agreement negotiations with FWCAC.
Figure 1: State regional gravity 1VD image with Osmond tenements EL6604 and EL6692 and granites
overlay on of Fowler Project Area
www.osmondresources.com.au
Figure 2: Significant intercepts from historical drilling.
-EndsThis announcement has been approved for release by the Board.
CONTACT
2B
Andrew Shearer | Executive Director
Mark Flynn | Investor Relations
andrew@osmondresources.com.au
info@osmondresources.com.au
+61 3 9614 0600
+61 416 068 733
www.osmondresources.com.au
ABOUT OSMOND RESOURCES
0B
Osmond Resources Limited is a mineral and exploration company committed to increasing
shareholder wealth through the exploration, development and acquisition of mineral resource
projects.
PROJECTS
The Fowler Domain Projects straddle the boundary of this geological domain in far western
South Australia. These major crustal scale domain bounding structures that traverse the
tenements have potential to host structurally upgraded magmatic Ni-Cr-Cu-PGE; layered
intrusive-hosted Ni-Cr-PGE; IOCG (Hiltaba Suite) deposits; intrusion-related (Tunkillia-type)
Au; and orogenic Au. While the proximity of the Fowler Domain Projects to nearby mineral
occurrences is no guarantee that it will be prospective for an economic reserve, recent
discoveries by Western Areas Limited (ASX:WSA) in the Fowler Domain have indicated the
nickel-copper sulphide pedigree of the region.
The Yumbarra Project, located in the Nuyts Domain of the Gawler Craton, contains a highly
magnetic feature that is interpreted as a layered ultramafic intrusive. Historical drilling has
reported a best intersection of Ni-Co anomalism in basement drilling of 1357 ppm Ni and 1066
ppm Co (further details provided on pages 46 and 78 of the Independent Geologist Report in
the Osmond Prospectus). There are also identified electromagnetic surveying targets yet to be
drilled on this target.
The Salt Wells Project is located in Churchill County, Nevada, U.S., within close proximity to
major highways and within 25 kilometres of the town of Fallon that has a population of over
8,500 people. The Project consists of 276 mineral claims, covering an area of ~36km2 with
surface salt samples in the northern area recording up to 810 ppm lithium, and 1% boron
(5.2% boric acid equivalent) (see ABR ASX Release 25 May 2018, “American Pacific Borate and
Lithium agrees earn in rights to acquire 100% interest in two Borate and Lithium exploration
Projects in Nevada, USA”). Borates were produced from surface salts in the 1800s from the
northern part of the Project area.
The Iberian One Project (Spain), recently Osmond entered into a staged Earn-In Agreement
to acquire up to 100% of the Iberian One Project, located in Spain. The Project is prospective
for Potassium Sulphate (SOP), Alumina products and Graphite. Osmond has commenced due
diligence during a six month exclusivity period.
www.osmondresources.com.au
Osmond Resources Projects
Competent Persons Statement
The information in this report that relates to Mineral Resources is based on information
compiled by Mr Charles Nesbitt. Mr Charles Nesbitt is a full-time employee of Osmond
Resources Ltd. Mr Charles Nesbitt has extensive experience uranium mining and exploration,
relevant to the style of mineralisation and type of deposit under consideration and to the
activity which they are undertaking to qualify as Competent Persons as defined in the 2012
edition of the Australasian Code for the Reporting of Exploration Results, Mineral Resources
and Ore Reserves (JORC code). Mr Charles Nesbitt consents to the inclusion of this information
in the form and context in which they occur.
www.osmondresources.com.au
APPENDIX 1
Table 1: Historical Drill Hole Details
*SARIG (South Australian Resources Information Gateway https://map.sarig.sa.gov.au/)
DATE
COMPLETED
TARGET
SARIG OPEN
FILE
ENVELOPE
No.
3-Sep-73
Uranium
ENV02170
27-Nov-80
Coal
ENV03830
7-Feb-70
Uranium
ENV01200
p.201
6-Feb-70
Uranium
ENV01200
p.204
6-Feb-70
Uranium
ENV01200
p.200
5-Feb-70
Uranium
ENV01200
p.162
12-Feb-70
Uranium
ENV01200
p.175
31-Jan-70
Uranium
ENV01200
p.207,208
5-Mar-70
Uranium
ENV01200
p.205
11-Feb-70
Uranium
ENV01200
p.187
Rotary
Loongana Pty Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
REFERENCE
NOTES
PLAN
2170(2)-18
PLAN
3830(2)-13
31-Jan-70
Uranium
ENV01200
24
Rotary
Loongana Pty Ltd.
2-Dec-80
Coal
ENV03830
-90
34
Rotary
Loongana Pty Ltd.
27-Nov-80
Coal
ENV03830
41.67
-90
20
Rotary
Loongana Pty Ltd.
30-Nov-80
Coal
ENV03830
53
46.56
-90
22
Rotary
Loongana Pty Ltd.
29-Nov-80
Coal
ENV03830
6536073
53
45.49
-90
28
Rotary
Loongana Pty Ltd.
29-Nov-80
Coal
ENV03830
249929
6535873
53
50.14
-90
16
Rotary
29-Nov-80
Coal
ENV03830
131309
268229
6534373
53
41.98
-90
44
Rotary
Loongana Pty Ltd.
Pechiney (Aust)
Exploration Pty Ltd.
4-Sep-73
Uranium
ENV02170
131337
254129
6528073
53
40.92
-90
50
Rotary
Loongana Pty Ltd.
6-Dec-80
Coal
ENV03830
p.209
PLAN
3830(2)-42
PLAN
3830(2)-12
PLAN
3830(2)-17
PLAN
3830(2)-15
PLAN
3830(2)-16
PLAN
3830(2)-14
PLAN
2170(2)-19
PLAN
3830(2)-27
Drill Hole
ID
SARIG* DH
No.
EASTING
(MGA
GDA94)
PIN-R 61
131308
269729
6538373
53
49.43
-90
22
Rotary
602 3
130920
261229
6540273
53
44.71
-90
20
Rotary
316-R 4D
131452
274629
6525674
53
41.1
-90
18.3
Rotary
316-R 4C
131450
275129
6525673
53
34.36
-90
15.24
Rotary
316-R 4C
131451
275129
6525673
53
34.36
-90
7.62
Rotary
316-R 5A
131472
273729
6526873
53
45.11
-90
13.72
Rotary
316-R 4M
131466
275029
6524373
53
30.78
-90
15.24
Rotary
316-R 4
131447
274629
6525674
53
41.1
-90
68.58
Rotary
316-R 4B
131449
274629
6525674
53
41.1
-90
24.38
Rotary
316-R 4G
131458
274129
6524473
53
33.58
-90
15.24
Rotary
316-R 3
131446
275529
6524473
53
35.78
-90
74.68
602 25
130932
257829
6524073
53
49.11
-90
602 2
130919
253429
6540173
53
55.08
602 7
130923
261429
6536273
53
602 5
130922
253629
6537074
602 6
131778
257529
602 4
130921
PIN-R 62
602 14
.
NORTHING
(MGA
GDA94)
MGA
ZONE
ELEVATION
DIP
MAX
DEPTH
(m)
Drill
Method
OPERATOR
Pechiney (Aust)
Exploration Pty Ltd.
DATE
COMPLETED
TARGET
14-Nov-73
Uranium
ENV02170
Rotary
OPERATOR
Pechiney (Aust)
Exploration Pty Ltd.
Australasian Mining
Corp Ltd.
SARIG OPEN
FILE
ENVELOPE
No.
3-Feb-70
Uranium
ENV01200
14
Rotary
Loongana Pty Ltd.
8-Dec-80
Coal
ENV03830
-90
18
Rotary
Loongana Pty Ltd.
1-Dec-80
Coal
ENV03830
48.08
-90
18
Rotary
30-Nov-80
Coal
ENV03830
53
48.68
-90
55.78
Rotary
Loongana Pty Ltd.
Australasian Mining
Corp Ltd.
3-Feb-70
Uranium
ENV01200
6528173
53
45.41
-90
31
Rotary
7-Dec-80
Coal
ENV03830
274729
6525373
53
36.39
-90
15.24
Rotary
10-Feb-70
Uranium
ENV01200
p.196
131455
274729
6525373
53
36.39
-90
15.24
Rotary
10-Feb-70
Uranium
ENV01200
p.192
316-R 4E
131456
274729
6525373
53
36.39
-90
6.4
Rotary
10-Feb-70
Uranium
ENV01200
p.193
316-R 4N
131467
275129
6523973
53
35.69
-90
15.24
Rotary
12-Feb-70
Uranium
ENV01200
p.173
316-R 5
131471
273229
6526273
53
40.68
-90
106.68
Rotary
Loongana Pty Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
p.161
PLAN
3830(2)-24
2-Feb-70
Uranium
ENV01200
602 24
130931
254029
6524173
53
53.12
-90
24
Rotary
Loongana Pty Ltd.
2-Dec-80
Coal
ENV03830
602 22
130929
246229
6523973
53
41.68
-90
18
Rotary
Loongana Pty Ltd.
1-Dec-80
Coal
ENV03830
602 30
130937
277629
6524673
53
45.48
-90
20
Rotary
Loongana Pty Ltd.
8-Dec-80
Coal
ENV03830
602 27
130934
265829
6524373
53
44.6
-90
12
Rotary
4-Dec-80
Coal
ENV03830
316-R 4H
131459
273729
6523573
53
32.13
-90
15.24
Rotary
11-Feb-70
Uranium
ENV01200
p.189
316-R 2B
131442
275829
6522973
53
42.42
-90
15.24
Rotary
Loongana Pty Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
p.164,165
PLAN
3830(2)-41
PLAN
3830(2)-39
PLAN
3830(3)-47
PLAN
3830(3)-44
13-Feb-70
Uranium
ENV01200
602 19
131260
273529
6528873
53
50.2
-90
18.1
Rotary
Loongana Pty Ltd.
8-Dec-80
Coal
ENV03830
602 26
130933
261829
6524273
53
46.74
-90
18
Rotary
Loongana Pty Ltd.
2-Dec-80
Coal
ENV03830
602 23
130930
250229
6523973
53
48.24
-90
24
Rotary
Loongana Pty Ltd.
1-Dec-80
Coal
ENV03830
p.218
PLAN
3830(2)-38
PLAN
3830(2)-43
PLAN
3830(2)-40
Drill Hole
ID
SARIG* DH
No.
EASTING
(MGA
GDA94)
NORTHING
(MGA
GDA94)
MGA
ZONE
PIN-R 73
131321
265929
6529173
53
316-R 7
131474
274029
6529573
53
37.66
-90
10.67
602 12
130928
265529
6532373
53
49.05
-90
602 11
130927
261629
6532173
53
51.38
602 10
130926
257529
6532073
53
316-R 6
131473
274229
6528073
602 13
131336
250129
316-R 4E
131454
316-R 4E
ELEVATION
DIP
MAX
DEPTH
(m)
Drill
Method
-90
57
Rotary
REFERENCE
NOTES
PLAN
2170(2)-31
p.159
PLAN
3830(2)-22
PLAN
3830(2)-21
PLAN
3830(2)-20
DATE
COMPLETED
TARGET
SARIG OPEN
FILE
ENVELOPE
No.
4-Feb-70
Uranium
ENV01200
p.157
5-Feb-70
Uranium
ENV01200
p.156
14-Feb-70
Uranium
ENV01200
p.167
13-Feb-70
Uranium
ENV01200
p.215
12-Feb-70
Uranium
ENV01200
p.177
4-Feb-70
Uranium
ENV01200
5-Dec-80
Coal
ENV03830
p.158
PLAN
3830(2)-28
4-Oct-75
Uranium
ENV02505
PLAN
2505(2)-23
14-Feb-70
Uranium
ENV01200
p.172
14-Feb-70
Uranium
ENV01200
p.169
11-Feb-70
Uranium
ENV01200
p.182
11-Feb-70
Uranium
ENV01200
p.185
11-Feb-70
Uranium
ENV01200
Loongana Pty Ltd.
30-Nov-80
Coal
ENV03830
30-Nov-80
Coal
ENV03830
Rotary
Loongana Pty Ltd.
Australasian Mining
Corp Ltd.
p.183
PLAN
3830(2)-19
PLAN
3830(2)-18
5-Feb-70
Uranium
ENV01200
15.2
Rotary
Loongana Pty Ltd.
15-Dec-80
Coal
ENV03830
-90
29.67
Rotary
Loongana Pty Ltd.
1-Dec-80
Coal
ENV03830
38.62
-90
23.3
Rotary
10-Dec-80
Coal
ENV03830
48.06
-90
28.96
Rotary
Loongana Pty Ltd.
Australasian Mining
Corp Ltd.
p.206
PLAN
3830(2)-33
PLAN
3830(2)-32
PLAN
3830(2)-36
10-Feb-70
Uranium
ENV01200
p.194
Drill Hole
ID
SARIG* DH
No.
EASTING
(MGA
GDA94)
NORTHING
(MGA
GDA94)
MGA
ZONE
ELEVATION
DIP
MAX
DEPTH
(m)
Drill
Method
316-R 8
131476
271429
6530473
53
42.01
-90
82
Rotary
316-R 8A
131477
271429
6530473
53
42.01
-90
6.7
Rotary
316-R 4Q
131470
275929
6525273
53
40.4
-90
15.24
Rotary
316-R 2C
131443
275329
6523473
53
38.18
-90
15.24
Rotary
316-R 4L
131465
274829
6524773
53
36.09
-90
15.24
Rotary
316-R 7A
131475
272229
6529173
53
47.48
-90
45.72
Rotary
602 15
131256
257729
6528773
53
52.32
-90
51.5
PIN-R 84
131332
275229
6525573
53
37.96
-90
72
Rotary
Rotary Percussio
n
316-R 4P
131468
275529
6525474
53
40.94
-90
12.19
Rotary
316-R 4P
131469
275529
6525474
53
40.94
-90
7.62
Rotary
316-R 4J
131462
273329
6525073
53
34.43
-90
15.24
Rotary
316-R 4I
131460
274529
6525073
53
34.24
-90
15.24
Rotary
316-R 4I
131461
274529
6525073
53
34.24
-90
15.24
Rotary
Pechiney (Aust)
Exploration Pty Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
602 9
130925
253929
6531973
53
41.28
-90
18
Rotary
602 8
130924
250129
6531873
53
41.65
-90
24
Rotary
316-R 4A
131448
274529
6525973
53
49.64
-90
3.35
602 17
131258
265729
6528873
53
48.39
-90
602 16
131257
261729
6528773
53
46.75
602 18
131259
269729
6528873
53
316-R 4F
131457
273729
6525373
53
OPERATOR
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Loongana Pty Ltd.
REFERENCE
NOTES
DATE
COMPLETED
TARGET
SARIG OPEN
FILE
ENVELOPE
No.
10-Feb-70
Uranium
ENV01200
p.198
12-Feb-70
Uranium
ENV01200
p.180
12-Feb-70
Uranium
ENV01200
Loongana Pty Ltd.
2-Dec-80
Coal
ENV03830
4-Dec-80
Coal
ENV03830
5-Nov-73
Uranium
ENV02170
13-Feb-70
Uranium
ENV01200
12-Nov-73
Uranium
ENV02170
31-Oct-73
Uranium
ENV02170
3-Nov-73
Uranium
ENV02170
p.211
PLAN
2170(2)-30
PLAN
2170(2)-21
PLAN
2170(2)-23
19-Nov-69
Uranium
ENV01200
p.272,273
27-Jan-70
Uranium
ENV01200
p.268,269
22-Nov-69
Uranium
ENV01200
9-Nov-73
Uranium
ENV02170
Rotary
Loongana Pty Ltd.
Pechiney (Aust)
Exploration Pty Ltd.
Australasian Mining
Corp Ltd.
Pechiney (Aust)
Exploration Pty Ltd.
Pechiney (Aust)
Exploration Pty Ltd.
Pechiney (Aust)
Exploration Pty Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Pechiney (Aust)
Exploration Pty Ltd.
Pechiney (Aust)
Exploration Pty Ltd.
p.178
PLAN
3830(3)-46
PLAN
3830(3)-45
PLAN
2170(2)-24
10-Nov-73
Uranium
ENV02170
6
Rotary
Loongana Pty Ltd.
18-Dec-80
Coal
ENV03830
-90
8
Rotary
17-Dec-80
Coal
ENV03830
54.68
-90
91.44
Rotary
Loongana Pty Ltd.
Australasian Mining
Corp Ltd.
p.267
PLAN
2170(2)-28
PLAN
2170(2)-29
PLAN
3830(3)-69
PLAN
3830(3)-68
25-Nov-69
Uranium
ENV01200
53
46.81
-90
10
Rotary
Loongana Pty Ltd.
16-Dec-80
Coal
ENV03830
6519973
53
48.01
-90
13
Rotary
Loongana Pty Ltd.
16-Dec-80
Coal
ENV03830
6520373
53
51.06
-90
69.52
Rotary
Loongana Pty Ltd.
25-Mar-81
Coal
ENV03830
Drill Hole
ID
SARIG* DH
No.
EASTING
(MGA
GDA94)
NORTHING
(MGA
GDA94)
MGA
ZONE
ELEVATION
316-R 4E
131453
274729
6525373
53
36.39
-90
15.24
Rotary
316-R 4K
131463
273929
6524973
53
33.62
-90
15.24
Rotary
316-R 4K
131464
273929
6524973
53
33.62
-90
6.1
Rotary
OPERATOR
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
602 29
130936
273629
6524673
53
35.43
-90
18
Rotary
602 28
130935
269629
6524573
53
44.47
-90
12
Rotary
PIN-R 67
131314
272429
6522773
53
-90
89
Rotary
316-R 2D
131444
275629
6522173
53
-90
15.24
Rotary
PIN-R 72
131320
265729
6522573
53
-90
75
Rotary
PIN-R 64
131311
276229
6516473
53
-90
46
Rotary
PIN-R 66
131313
272429
6521873
53
-90
86
Rotary
316-M 3
131406
277329
6517973
53
33.7
-90
82.3
Rotary
316-M 3C
131409
278229
6517973
53
45.93
-90
102.12
Rotary
316-M 4
131410
279129
6518573
53
44
-90
29.26
Rotary
PIN-R 71A
131318
263529
6516373
53
-90
21
Rotary
PIN-R 71B
131319
263529
6516373
53
-90
72
602 50
130945
277829
6516673
53
37.7
-90
602 49
130944
273829
6516573
53
37.9
316-M 6
131415
282429
6518173
53
602 33
130939
250329
6520073
602 32
130938
246229
602 34
131261
254029
48.35
DIP
MAX
DEPTH
(m)
Drill
Method
REFERENCE
NOTES
p.259-261
PLAN
3830(3)-49
PLAN
3830(3)-48
PLAN
3830(2)-52
DATE
COMPLETED
TARGET
SARIG OPEN
FILE
ENVELOPE
No.
30-Mar-81
Coal
ENV03830
Rotary
Loongana Pty Ltd.
Australasian Mining
Corp Ltd.
14-Feb-70
Uranium
ENV01200
6
Rotary
Loongana Pty Ltd.
9-Dec-80
Coal
ENV03830
-90
9.5
Rotary
9-Dec-80
Coal
ENV03830
31.88
-90
15.24
Rotary
13-Feb-70
Uranium
ENV01200
p.219
53
37.81
-90
91.44
30-Jan-70
Uranium
ENV01200
6520472
53
52.39
-90
66
Rotary
Cable
Tool
Loongana Pty Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
p.213
PLAN
3830(3)-58
PLAN
3830(3)-57
Loongana Pty Ltd.
7-Apr-81
Coal
ENV03830
266029
6520473
53
47.02
-90
14
Rotary
15-Dec-80
Coal
ENV03830
131439
276529
6520673
53
32.24
-90
56.69
Rotary
29-Jan-70
Uranium
ENV01200
p.222
316 19
131394
282929
6509373
53
62.94
-90
7.67
Rotary
4-Nov-69
Uranium
ENV01200
p.288
316-M 5C
131414
280929
6519473
53
52.74
-90
51.82
13-Dec-70
Uranium
ENV01200
602 58
1275
266495
6508920
53
44.25
-90
80
Rotary
Cable
Tool
Loongana Pty Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
p.220,221
PLAN
3830(2)-55
PLAN
3830(3)-56
20-Mar-81
Coal
ENV03830
316-M 10
131416
284929
6518973
53
74.12
-90
25.91
Rotary
14-Dec-69
Uranium
ENV01200
p.254
316-M 10A
131417
284929
6518973
53
74.12
-90
28.96
Rotary
14-Dec-69
Uranium
ENV01200
p.254
316-M 10B
131418
284929
6518973
53
74.12
-90
86.87
Rotary
14-Dec-69
Uranium
ENV01200
p.254-256
316-M 5
131411
280829
6518873
53
48.21
-90
24.38
Rotary
22-Nov-69
Uranium
ENV01200
p.266
316-M 5A
131412
280829
6518873
53
48.21
-90
84.43
11-Dec-69
Uranium
ENV01200
602/57
801
262674
6508761
53
60.4
-90
97
Rotary
Cable
Tool
Loongana Pty Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
p.262
PLAN
3830(3)-80
7-Mar-81
Coal
ENV03830
316 28
131428
273629
6510573
53
29.73
-90
22.38
Rotary
2-Nov-69
Uranium
ENV01200
p.274
316 27
131405
274929
6512373
53
16.83
-90
22.99
Rotary
2-Nov-69
Uranium
ENV01200
p.275
316 26A
131402
276229
6516873
53
42.19
-90
49.28
Rotary
Loongana Pty Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
p.265
VOL 3,
PAGE 268
2-Nov-69
Uranium
ENV01200
p.278
Drill Hole
ID
CHUNDIE
SWAMP 35
SARIG* DH
No.
EASTING
(MGA
GDA94)
NORTHING
(MGA
GDA94)
MGA
ZONE
ELEVATION
DIP
MAX
DEPTH
(m)
950
258239
6520457
53
45.31
-90
71
Drill
Method
Cable
Tool
316-R 2E
131445
276429
6522473
53
33.17
-90
15.24
602 39
130942
273729
6520574
53
50.93
-90
602 38
130941
269729
6520473
53
38.56
316-R 2A
131441
276229
6521873
53
316-R 2
CHUNDIE
SWAMP 36
131440
276029
6522573
951
262278
602 37
130940
316-R 1
OPERATOR
REFERENCE
NOTES
PLAN
3830(2)-54
DATE
COMPLETED
TARGET
SARIG OPEN
FILE
ENVELOPE
No.
Loongana Pty Ltd.
19-Apr-81
Coal
ENV03830
Loongana Pty Ltd.
Pechiney (Aust)
Exploration Pty Ltd.
5-Jul-80
Coal
ENV03830
1-Nov-73
Uranium
ENV02170
Loongana Pty Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
17-Dec-80
Coal
ENV03830
VOL 2
PLAN
2170(2)-22
PLAN
3830(3)-67
21-Nov-69
Uranium
ENV01200
p.271
21-Nov-69
Uranium
ENV01200
p.270
Pechiney (Aust)
Exploration Pty Ltd.
2-Oct-75
Uranium
ENV02505
Rotary
Loongana Pty Ltd.
17-Apr-81
Coal
ENV03830
75.6
Rotary
Loongana Pty Ltd.
1-Apr-81
Coal
ENV03830
-90
73.2
Rotary
28-Feb-81
Coal
ENV03830
73.7
-90
64
Rotary
8-Nov-73
Uranium
ENV02170
53
50.84
-90
89.92
12-Dec-69
Uranium
ENV01200
p.263,264
6517773
53
36.24
-90
48
3-Oct-75
Uranium
ENV02505
PLAN
2505(2)-22
277629
6517573
53
34.23
-90
72
Rotary
Rotary Percussio
n
Rotary Percussio
n
Loongana Pty Ltd.
Pechiney (Aust)
Exploration Pty Ltd.
Australasian Mining
Corp Ltd.
PLAN
2505(2)-20
PLAN
3830(3)-66
PLAN
3830(3)-65
PLAN
3830(3)-63
PLAN
2170(2)-27
3-Oct-75
Uranium
ENV02505
131310
279029
6516273
53
-90
44.5
Rotary
30-Oct-73
Uranium
ENV02170
PLAN
2505(2)-21
PLAN
2170(2)-20
316 26C
131404
275329
6513773
53
43.51
-90
12.19
Rotary
18-Nov-69
Uranium
ENV01200
p.276
316 26
131401
275129
6514973
53
35.98
-90
17.25
Rotary
1-Nov-69
Uranium
ENV01200
p.279
316 26B
131403
275129
6514973
53
35.98
-90
10.69
Rotary
18-Nov-69
Uranium
ENV01200
PIN-R 68
131315
269829
6515873
53
-90
53.5
Rotary
6-Nov-73
Uranium
ENV02170
p.277
PLAN
2170(2)-25
Drill Hole
ID
SARIG* DH
No.
EASTING
(MGA
GDA94)
NORTHING
(MGA
GDA94)
MGA
ZONE
ELEVATION
DIP
MAX
DEPTH
(m)
602 44
131264
254129
6516373
53
61.06
-90
30
602/1
1540
277390
6517732
53
34.09
-90
53
Rotary
Diamond
Bit Coring
PIN-R 65
131312
272729
6516273
53
-90
36
Rotary
602 48
130943
269829
6516573
53
45.21
-90
18
Rotary
316-M 3A
131407
276929
6518873
53
32.85
-90
30.48
Rotary
316-M 3B
131408
276929
6518873
53
32.85
-90
9.7
PIN-R 81A
131329
281129
6517773
53
55.97
-90
96
Rotary
Rotary Percussio
n
602 47
131267
266129
6516573
53
58.79
-90
38.25
602 46
131266
262129
6516473
53
45.23
-90
602 45
131265
258029
6516373
53
44.02
PIN-R 70
131317
267029
6516573
53
316-M 5B
131413
280829
6518373
PIN-R 83
131331
277029
PIN-R 82
131330
PIN-R 63
Drill
Method
OPERATOR
Pechiney (Aust)
Exploration Pty Ltd.
Pechiney (Aust)
Exploration Pty Ltd.
Pechiney (Aust)
Exploration Pty Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Pechiney (Aust)
Exploration Pty Ltd.
REFERENCE
NOTES
PLAN
3830(2)-59
Drill Hole
ID
SARIG* DH
No.
EASTING
(MGA
GDA94)
NORTHING
(MGA
GDA94)
MGA
ZONE
ELEVATION
DIP
MAX
DEPTH
(m)
316 20
131397
282229
6511773
53
59.23
-90
6.83
602/56
CHUNDIE
SWAMP
602 55
1541
266448
6512575
53
62.06
-90
40
Rotary
Cable
Tool
952
262400
6512478
53
55.91
-90
75.5
Cable
Tool
602 54
131268
254229
6512273
53
68.38
-90
32.75
Rotary
316 20A
131398
282229
6512173
53
57.41
-90
37.44
Rotary
PIN-R 69
131316
266629
6509473
53
-90
87
Rotary
316 24
131399
279529
6511973
53
47.52
-90
8.66
Rotary
316 25
131400
277829
6512673
53
44.01
-90
12.27
Rotary
316 6
131387
268829
6507673
53
36.94
-90
16.05
Rotary
316 1D
131381
277229
6507773
53
40.05
-90
37.8
WGAC0104
293720
281334.89
6535312.52
53
95.59
-90
97
WGAC0105
293721
266739.87
6542756.52
53
70.69
-90
100.5
WGAC0106
293722
267075.84
6542526.58
53
61.79
-90
96
WGAC0107
293723
267417.85
6542350.55
53
62.86
-90
102
WGAC0108
293724
269574.88
6541276.54
53
60.61
-90
81
WGAC0109
293725
270996.91
6540563.5
53
100
-90
91.5
WGAC0110
293726
271328.91
6540372.5
53
60.95
-90
50
Rotary
Aircore
(see also
RCA)
Aircore
(see also
RCA)
Aircore
(see also
RCA)
Aircore
(see also
RCA)
Aircore
(see also
RCA)
Aircore
(see also
RCA)
Aircore
(see also
RCA)
Drill
Method
OPERATOR
Australasian Mining
Corp Ltd.
DATE
COMPLETED
TARGET
SARIG OPEN
FILE
ENVELOPE
No.
3-Nov-69
Uranium
ENV01200
Loongana Pty Ltd.
21-Feb-81
Coal
ENV03830
Loongana Pty Ltd.
17-Feb-81
Coal
ENV03830
Loongana Pty Ltd.
Australasian Mining
Corp Ltd.
Pechiney (Aust)
Exploration Pty Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
Australasian Mining
Corp Ltd.
23-Apr-81
Coal
ENV03830
3-Nov-69
Uranium
ENV01200
7-Nov-73
Uranium
ENV02170
p.292
PLAN
2170(2)-26
3-Nov-69
Uranium
ENV01200
p.281
3-Nov-69
Uranium
ENV01200
p.280
18-Oct-69
Uranium
ENV01200
p.151
4-Nov-69
Uranium
ENV01200
Doray Minerals Ltd.
28/04/2016
Gold
ENV13044
Doray Minerals Ltd.
29/04/2016
Gold
ENV13044
Doray Minerals Ltd.
29/04/2016
Gold
ENV13044
Doray Minerals Ltd.
30/04/2016
Gold
ENV13044
Doray Minerals Ltd.
1/05/2016
Gold
ENV13044
Doray Minerals Ltd.
1/05/2016
Gold
ENV13044
Doray Minerals Ltd.
2/05/2016
Gold
ENV13044
p.139.
PACE
Project
DPY9-25
PACE
Project
DPY9-25
PACE
Project
DPY9-25
PACE
Project
DPY9-25
PACE
Project
DPY9-25
PACE
Project
DPY9-25
PACE
Project
DPY9-25
REFERENCE
NOTES
p.290
PLAN
3830(3)-75
PLAN
3830(3)-72
PLAN
3830(3)-70
Drill Hole
ID
SARIG* DH
No.
EASTING
(MGA
GDA94)
NORTHING
(MGA
GDA94)
MGA
ZONE
ELEVATION
DIP
MAX
DEPTH
(m)
WGAC0111
293727
271702.88
6540214.57
53
61.67
-90
40.5
WGAC0112
293728
272060.85
6540028.55
53
66.33
-90
23.5
WGAC0113
293729
272433.88
6539780.51
53
66.92
-90
33
WGAC0114
293730
272778.92
6539662.52
53
57.78
-90
67.5
WGAC0115
293731
273130.9
6539487.54
53
57.76
-90
72.5
WGAC0116
293732
273501.84
6539285.56
53
64.56
-90
62.5
WGAC0117
293733
273844.89
6539112.58
53
79.74
-90
42
WGAC0118
293734
274202.85
6538950.56
53
76.37
-90
57
WGAC0119
293735
274569.88
6538764.55
53
70.75
-90
54
WGAC0120
293736
274927.84
6538578.55
53
79.11
-90
84
WGAC0121
293737
275282.88
6538390.48
53
83.78
-90
77
WGAC0122
293738
275633.86
6538213.52
53
85.2
-90
88.5
WGAC0123
293739
275987.87
6538032.5
53
88.68
-90
77
WGAC0124
293740
276353.89
6537841.53
53
71.09
-90
80
Drill
Method
Aircore
(see also
RCA)
Aircore
(see also
RCA)
Aircore
(see also
RCA)
Aircore
(see also
RCA)
Aircore
(see also
RCA)
Aircore
(see also
RCA)
Aircore
(see also
RCA)
Aircore
(see also
RCA)
Aircore
(see also
RCA)
Aircore
(see also
RCA)
Aircore
(see also
RCA)
Aircore
(see also
RCA)
Aircore
(see also
RCA)
Aircore
(see also
RCA)
DATE
COMPLETED
TARGET
SARIG OPEN
FILE
ENVELOPE
No.
Doray Minerals Ltd.
2/05/2016
Gold
ENV13044
Doray Minerals Ltd.
2/05/2016
Gold
ENV13044
Doray Minerals Ltd.
2/05/2016
Gold
ENV13044
Doray Minerals Ltd.
2/05/2016
Gold
ENV13044
Doray Minerals Ltd.
3/05/2016
Gold
ENV13044
Doray Minerals Ltd.
3/05/2016
Gold
ENV13044
Doray Minerals Ltd.
3/05/2016
Gold
ENV13044
Doray Minerals Ltd.
3/05/2016
Gold
ENV13044
Doray Minerals Ltd.
4/05/2016
Gold
ENV13044
Doray Minerals Ltd.
4/05/2016
Gold
ENV13044
Doray Minerals Ltd.
4/05/2016
Gold
ENV13044
Doray Minerals Ltd.
5/05/2016
Gold
ENV13044
Doray Minerals Ltd.
5/05/2016
Gold
ENV13044
Doray Minerals Ltd.
6/05/2016
Gold
ENV13044
OPERATOR
REFERENCE
NOTES
PACE
Project
DPY9-25
PACE
Project
DPY9-25
PACE
Project
DPY9-25
PACE
Project
DPY9-25
PACE
Project
DPY9-25
PACE
Project
DPY9-25
PACE
Project
DPY9-25
PACE
Project
DPY9-25
PACE
Project
DPY9-25
PACE
Project
DPY9-25
PACE
Project
DPY9-25
PACE
Project
DPY9-25
PACE
Project
DPY9-25
PACE
Project
DPY9-25
Drill Hole
ID
SARIG* DH
No.
EASTING
(MGA
GDA94)
NORTHING
(MGA
GDA94)
MGA
ZONE
ELEVATION
DIP
MAX
DEPTH
(m)
WGAC0125
293741
276707.85
6537652.5
53
84.65
-90
97.5
WGAC0126
293742
277068.89
6537479.59
53
89.49
-90
81.5
WGAC0127
293743
277415.85
6537304.6
53
90.44
-90
102
WGAC0128
293744
277773.88
6537110.52
53
83
-90
84
WGAC0129
293745
278132.91
6536940.53
53
87.1
-90
93
WGAC0130
293746
278474.89
6536765.51
53
87.95
-90
78
WGAC0131
293747
278842.86
6536572.5
53
87.1
-90
111.5
WGAC0132
293748
279203.9
6536404.51
53
95.28
-90
96
WGAC0133
293749
279559.88
65
Share your feedback
Discover