Quarterly Activities and Cash Flow Report
Released
Released
Announcement PDF
17 October 2023
QUARTERLY
ACTIVITIES REPORT
30 September 2023
HIGHLIGHTS
OPERATIONAL
Updated Paris Mineral Resource Estimate (MRE)
o
Total Mineral Resource estimated at 24Mt @ 73g/t silver and 0.41% lead for
57Mozs silver and 99kt lead at a cut-off of 25g/t silver
o
Indicated Resource component is 17Mt @ 75g/t silver and 0.50% lead,
72% of resource in Indicated category
o
MRE takes into account recent drilling from Paris South and further resource infill drilling at Paris
Paris DFS Studies advance
o
JBS&G to undertake environmental studies and coordinate project approvals
o
Paris regional environmental survey completed
Mincore appointed to deliver key engineering, procurement and construction
(EPC) cost estimates for the DFS
o
Hydrological test work completed with final analysis to ensure sufficient water
for operational requirements nearing completion
o
Hydrological test work at Paris is also complete and analysis to determine pit
dewatering and regional impacts of pumping also near completion
o
Metallurgical test work focussed on lead recovery in progress at ALS Laboratories in Tasmania
Initial fieldwork on Nonning South and Yardea tenements conducted.
Molyhil tungsten project earn-in (NT)
o
Resource drilling and gravity survey planned for completion by year end
CORPORATE
Cash at 30 Sept 2023 $3.3M
OPERATIONS
Paris Silver Project
Investigator’s principal asset is the 100% owned Paris Silver Project, located approximately 70km north of
the rural township of Kimba on South Australia’s Eyre Peninsula. Access to the project site is predominantly via highways and sealed roads and is approximately 7 hours by road from Adelaide, as seen in
Figure 1 (below). Major regional centres with industrial capacity, support services and airports are Whyalla
(212km) and Port Augusta (227km).
Paris is a shallow high-grade silver deposit amenable
to open pit mining, providing outstanding exposure to
silver, a metal with strong commodity, renewable energy and manufacturing demand.
During the Quarter Investigator released an updated JORC 2012 Mineral Resource Estimate of
24Mt @ 73g/t silver and 0.41% lead for 57Mozs
silver and 99kt lead1.
The previously released Paris Silver Project PreFeasibility Study (PFS) reported financial results
of: pre-tax NPV8 A$202M, pre-tax IRR 54.1%
with estimated capital costs of A$131M2&3. Comprehensive work programs currently underway to
complete the Definitive Feasibility Study (DFS),
based on the updated MRE, in early 2024.
Investigator continues to progress exploration
across adjacent significant ground holdings
within South Australia and also a farm-in at the
Molyhil Tungsten Project in the Northern
Territory.
Figure 1: Investigator’s South Australian tenements
Paris Silver Project – Updated Mineral Resource Estimate
Early in the September Quarter, the Company released an updated Mineral Resource Estimate (MRE) to
the ASX4. The new JORC 2012 Mineral Resource Estimate of 24Mt @ 73g/t silver and 0.41% lead for
57Mozs silver and 99kt lead represents a 7% increase on the previous 2021 Mineral Resource Estimate.
An additional 76 holes, drilled since the 2021 resource update, were included in this latest Mineral Resource Estimate. Whilst the majority of these holes targeted the potential resource extension to the south
of Paris, additional exploration drilling was completed along the western and eastern flanks of the deposit
as well as in the central zone of the resource - located between the optimised northern and southern pits.
1 - ASX 5 July 2023 – “Paris Mineral Resource Update” (refer Appendix 1 for Resource Table).
2 - ASX 30 November 2021 – “Paris PFS delivers outstanding results”
ABN 90 115 338 979 | ASX: IVR | Page 2 of 18
PO Box 3235, Norwood SA 5067
+61 (0) 8 7325 2222 | info@investres.com.au
www.investres.com.au
3 - Note: Paris PFS completed on previous resource – as released
to ASX 30 Nov 2021
4 - ASX 5 July 2023 – “Paris Mineral Resource Update” (refer Appendix 1 for Resource Table).
The results from the entirety of these drill programs, and historical programs since the discovery of Paris
in 2011, were utilised in the revised Mineral Resource Estimate, which is now informing the mining evaluations in the current Paris Definitive Feasibility Study. The increase to the Paris silver inventory, is in part
due to addition of the recently accessed area at Paris South, but additionally the inclusion of mineralisation
at slightly greater depth which has been refined with additional drilling in this program. The new drilling
has also resulted in significant areas of the resource estimate being better defined.
The 2023 updated Mineral Resource Estimate represents an approximate 7% increase in total silver
ounces compared to the 2021 Mineral Resource Estimate. This increase in ounces is due to the additional
drilling in the south of the deposit, consideration of a 175m depth as having reasonable prospects of economic extraction, and use of a 25g/t silver cut-off which is supported by improved silver price environment
and anticipated project economics. Closer spaced infill drilling in the central zone and further drilling to
the north-east of the deposit has provided a more detailed and deliverable result, with a consequential
reduction of resource ounces in these areas.
Table 1 (below) provides a summary breakdown of the 2023 Mineral Resource Estimate which has resulted in an approximate 27% increase in resource tonnes, a 17% decrease in grade for a resultant 7%
increase in contained silver metal to 57Mozs of silver with an approximate 1.5% increase to 99kt of contained lead. Note: The figures in Table 1 are rounded to reflect the precision of the estimates and include
rounding errors.
Indicated
Inferred
Total
Paris Mineral Resource Estimates at 25g/t cut-off
Tonnes
Ag
Pb
(million)
g/t
%
17
75
0.50
7.2
67
0.20
24
73
0.41
Ag
moz
41
16
Pb
kt
85
14
57
99
Table 1: 2023 Paris Silver Project Mineral Resource estimate (25g/t silver cut-off grade). As reported to ASX 5 July 2023.
Figure 2 (below) shows the 2023 resource block model in plan view, with the classification criteria distinguished by colour (blue = Inferred, red = Indicated). Only blocks containing estimates at the 25g/t cut off
silver shown.
The changes to classification, dimension and distribution of the estimates can be seen with the extension
of both Inferred and Indicated resources into the Paris South area.
Page | 3
Figure 2: Collar plan showing location of the 76 new holes (yellow dots) over the 2023 resource classification block model,
Indicated (red) and Inferred (blue). As released to ASX 5 July 2023.
In Figure 3 below, the upper image (with south to the left of image) is a long section that displays the 2023
Paris MRE resource classifications (red = Indicated, blue = Inferred) and the lower image is a long section
that shows the distribution of grade, noting the dashed line shows the approximate 175m lower resource
limit at 0mRL.
Figure 3: Long sections of the 2023 Paris Silver Project Mineral Resource estimate block model along section 10000mE (+/- 25m
section window), showing distribution of Indicated and Inferred categories (upper image) and average block silver grade (lower
image). Block sizing is 25m x 25m x 5m, with blue line indicating the interpreted dolomite surface. The dashed line shows the
approximate 175m lower resource limit at 0mRL. Only model blocks containing estimates at 25g/t Ag cut-off are shown.
Page | 4
Shown in Figure 4 are the grade/tonnage curves for the 2023 global resource (both Indicated and Inferred
classifications) that illustrate the decreasing resource tonnage (blue line) against an increasing cut-off
grade (x-axis). This grade/tonnage curve highlights the sensitivity of the resource to changes in the cut-off
grade.
Figure 4: Grade/tonnage curves for the 2023 Paris Silver Project Mineral Resource estimate (global resource above 0mRL), with
tonnage (blue line), contained ounces (red line) and average resource grade (orange line).
For comparative purposes, the grade/tonnage curves for the 2023 resource component classified as Indicated are shown below in Figure 5.
Figure 5: Grade/tonnage curves for the Indicated Resource component of the 2023 Paris Silver Project
Mineral Resource Estimate.
Page | 5
2023 Mineral Resource Classification
The 2023 Mineral Resource estimates for silver and lead are classified as Indicated and Inferred. Estimates for mineralisation within the main mineralised envelope tested by drilling spaced at generally around
25m x 25m to 50m x 50m are classified as Indicated. Estimates for more broadly sampled mineralisation
and all of the background domain, extrapolated up to generally around 75m from drilling, are classified as
Inferred. Confidence categories assigned to the estimates reflect drill hole spacing, sensitivity of the estimates to the treatment of extreme silver grades and the variability in mineralisation continuity by modelled
domain.
In preparing the MRE, Investigator’s independent resource consultant took into account that current project
economics are primarily driven by silver, with lead interpreted to represent a comparatively minor proportion of potential revenue, and on that basis the classification approach primarily reflects confidence in silver
grades.
2023 Mineral Resource additional information
The drill hole database supplied to the resource consultant, supported by QA/QC reporting documentation,
comprises information from 743 drill holes (comprising 78 aircore (AC), 494 reverse circulation (RC) and
171 diamond holes (DD)) for an aggregate total of 84,666m of drilling. Central portions of the Paris deposit
have been tested by predominantly 25m spaced traverses of generally vertical AC, RC and DD drilling
with notably broader spaced drilling in peripheral areas and at depth.
The largely vertical drilling orientation, particularly adopted since 2016, is as a result of improved
knowledge of both the geological setting and the largely flat lying mineralisation geometry. Angled, oriented
holes dominate earlier RC and DD drilling and are still used in more peripheral margins of the deposit
where geological knowledge is less well developed. Drillhole spacing along traverses is nominally 25m
over the majority of the deposit.
Domains used in estimation
Modelling domains utilised in the current study comprised three dimensional wireframes representing the
main rock units within the Paris deposit, key weathering horizons and a set of mineralised domains. The
rock type and weathering domains, which were used for density assignment and to guide mineralised
domain interpretation were constructed from interpretations provided by Investigator.
Modelled rock units comprise mineralised breccia, bounding metasediments, underlying dolomitic basement and granitic intrusions and a series of cross cutting felsic dykes which are overlain by an average of
around 4 metres of barren colluvium sediments (Figures 6 and 7 below). The main breccia sequence was
subdivided into a main northern unit, and a subsidiary southern unit, located south of the southern cross
cutting dyke reflecting differences in alteration intensity.
Page | 6
Figure 6: Cross-section in the northern area of the deposit showing the average (E type) grade of 2023 resource model blocks
containing estimates at 25g/t cut off (+/- 12.5m section window). The background colours indicate the geological setting. Note,
block model below drill hole depths is informed by drilling off-section
Figure 7: Cross-section in the southern area of the deposit, showing the average (E type) grade of 2023 resource model blocks
containing estimates at 25g/t cut off (+/- 12.5m section window). The background colours indicate the geological setting. Note,
block model below drill hole depths is informed by off-section drilling.
The resource consultant interpreted the mineralised domains from 2m down-hole composited silver grades
with reference to rock unit interpretations. The resultant domains comprise a generally sub-horizontal main
envelope capturing continuous 2m down-hole composited silver grades of greater than approximately
10g/t silver and a background domain outlining zones of less continuous mineralisation (Figure 8 below).
Page | 7
Figure 8: Plan view showing drill collars used in the 2023 Mineral Resource Estimate and set of mineralised domains utilised in
the 2023 estimation
The main mineralised envelope trends north-south over approximately 2km with an average width of 400m
averaging approximately 40m thickness and is generally associated with a polymictic breccia unit, with
extension into the dolomite and metasediment units over comparatively short distances. The main mineralised domain was subdivided into 6 domains of comparable silver mineralisation tenor. The background
domain extends north-south over approximately 2km, encapsulating the main mineralised envelope with
an average width of approximately 530m and reaching a maximum depth of approximately 240m below
ground level.
Conclusion
This 2023 Paris Mineral Resource Estimate update will be utilised for further mine planning, design and
optimisation studies which will be reported as part of the Paris Definitive Feasibility Study that is currently
being undertaken.
Page | 8
Paris Silver Project – DFS Studies Advance
A number of key studies have been progressed or completed during the quarter as the Company continues
to advance the Paris Silver Project Definitive Feasibility Study. A baseline environmental audit was undertaken across the Peterlumbo tenement early in the exploration phase at Paris (2013). This included aspects
such as identification of flora and fauna significant to the region, and documentation of native and introduced
species. This data provides a valuable snapshot, early in the project development timeline.
Following successful competitive tender, JBS&G were appointed as environmental consultants and have
reviewed a range of environmental and risk assessment reports, then undertaking a gap analysis to ensure
that any changed provisions of the state and federal regulatory requirements, such as the Federal Environment Protection and Biodiversity Conservation Act, will be addressed.
From this review a work plan was developed for an additional field survey. A team was mobilised to site and
completed a field survey, building on prior survey work and addressing gaps in knowledge identified from
both a flora and fauna perspective. The survey was timed for Spring when maximum diversity is expected
to occur in the region.
The focus of the flora program was the collection of vegetation data relevant to federal and state Acts such
as the Native Vegetation Act 1991 and Native Vegetation Regulations 2017. Additionally, any flora species
of National, State or local conservation significance that occur in the area were be recorded, including any
declared plants under the Landscape South Australia Act 2016.
In conjunction with the flora survey, a fauna survey was undertaken. Focussed on the available habitat in
the region surrounding the Paris Project, the ecologists documented both feral and native species, in addition to focussed attention on fauna that may have national, state or local conservation significance.
The pictures below show ecologists undertaking fauna and birdlife tracking at Paris.
Engineering Design and Cost Estimation
Mincore, the Melbourne-based Engineering, Procurement, and Construction (EPC) consultancy group
who undertook the engineering design and cost estimation for the Paris PFS in 2021, have been appointed
to deliver key aspects of the Paris DFS. Familiar with the Paris Project, Mincore will build on prior
knowledge and have a reputation of delivering fit-for-purpose outcomes. A key focus of the DFS is to
advance the detail and validate the assumptions made in the PFS.
Page | 9
The work Mincore has commenced includes review of project aspects including process plant design and
layout drawings (including equipment arrangement), infrastructure requirements, and the delivery of utilities such as power and water. Capital cost estimates for the purchase, construction and commissioning of
the facilities will also be confirmed. MinAssist, a resource industry focussed consultant who provide expertise in the development and optimisation of minerals processing projects, were previously the project managers for the Paris PFS and will continue to provide key support and act on behalf of Investigator as the
owner’s representative for all engineering tasks.
Hydrological Modelling
Hydrological modelling of the data acquired during the drilling and pump testing (conducted at both the
proposed Paris open pit area and Hector, the planned process water source, and completed in July 2023)
is progressing. The modelling of groundwater within the Paris deposit has neared completion and includes
the development of regional gradients, geological domaining and dewatering aspects of the proposed
Paris open pit. Modelling of the Hector bore field, the planned source of process plant water supply, is
being finalised.
During this phase of work, Investigator consulted with representatives of the South Australian Department
for Energy and Mining and the Department for Environment and Water to ensure that basic modelling
parameters and assumptions were in line with departmental expectations. This valued engagement saw
a number of modelling aspects addressed early in order to include their feedback.
Hydrological data proximal to the pit environment and a dewatering model have been provided to Investigator’s geotechnical consultant to allow completion of geotechnical assessments and input prior to open
pit optimisation using the updated 2023 Mineral Resource Estimate.
Metallurgical Test Work
Lead, whilst a minor component of the Paris deposit, has the potential to add value to the project and was
not considered in the 2021 Pre-Feasibility Study.
A program of lead recovery test work was developed, and a comprehensive analysis of drill hole assay
data was used to identify that a sufficient volume of samples to support this test work could be compiled
from both retained assay pulps and drill holes samples. During the Quarter, approximately 600kg of samples were selected and delivered to the ALS Laboratories in Burnie, Tasmania, who are well regarded
within the industry for their flotation expertise.
Page | 10
ASX Release – Investigator
Quarterly Activities Report
30 September 2023
Metallurgical test work continues to progress with
focus on lead flotation from samples of both sulphide and oxidised mineralisation.
Recovery from the oxidised material has always
been acknowledged as challenging, however
early results provide encouragement.
MinAssist, Investigator’s metallurgical specialist
consultants will travel to Burnie in the December
Quarter to work with ALS metallurgists in determining an optimum “recipe” for recovery of Paris
lead.
The picture to the left shows flotation of Paris lead
in preliminary test work.
Additional geometallurgical modelling has been undertaken over recent months, with multi-element geochemistry, targeted x-ray diffraction mineralogy and a machine learning body of work identifying a number
of different mineralised clusters, which were able to be further broken down into a number of sub-domains
based on gangue (waste) mineralogy.
Diamond core samples were identified from a selection of historic drillholes and samples collected for
additional test work on variability, both from a comminution (crushing and grinding) and silver recovery
perspective. This test work on variability will allow the process engineers to understand what potential
differences in physical and chemical properties may need to be accounted for as part of plant design and
potential reagent consumption changes. This information will be critical to efficient plant operation and
effective mineral recovery.
The machine learning geometallurgical study is also being utilised in reviewing and refining waste characterisation studies on Paris. Waste characterisation determines the relative stability or instability of waste
material to the environment, in addition to determining potential hazards and how to safely mitigate risk.
An example is determining the relative levels of potential for acid generation of different waste materials,
knowing whether specific rock types are potentially acid generating, non-acid generating or acid consumers allows for the efficient and effective planning and design of waste dumps to eliminate risk, such as
encapsulation of potentially acid generating waste within acid consuming waste. This characterisation
study builds on prior work as part of the 2021 PFS for Paris and will address regulatory requirements
during any permitting process.
Page | 11
ASX Release – Investigator
Quarterly Activities Report
30 September 2023
Other Investigator Tenements
Stuart Shelf Tenements
As at the end of September 2023, Gold Road Ltd (ASX:GOR) had spent approximately $2.5M in their
earn-in to Investigator’s Stuart Shelf tenements. Having satisfied the Stage 2 Commitment of $2M, GRO
have notified Investigator of their intention to form the 51:49 Joint Venture interest in the tenements. Application has been made to the SA regulator to transfer the 51% interest earned in the Joint Venture tenements to GRO.
Joint Venture documentation is being drafted.
Fowler Domain Tenements
As at the end of September 2023, Osmond Resources Ltd (ASX:OSM) had spent approximately $240k
toward their Stage 1 commitment of $275k.
OSM have informed the Company that they are finalising arrangements to undertake a regional gravity
geophysical exploration across the tenements in the December quarter.
As part of the Earn-In Agreement, OSM issued Investigator 1.1M OSM shares, which at 30 September
2023 had an approximate value of $100k.
Subsequent to the end of the Quarter, Investigator sold these shares in an off-market transfer facilitated
by Taylor Collison. Proceeds of approximately $98k were received in mid-October.
Curnamona Tenements
The detailed drone aeromagnetic survey flown over key prospect areas has provided valuable data in
developing targeted drill plans. It is anticipated that drilling will commence on these prospects in the first
half of 2024.
East Eyre Tenements
Work is continuing to advance NTMA negotiations to allow access with Native Title groups over the Lake
Macfarlane, Wartarka, Corunna and Siam tenements. Planning work has been completed with targeted
soil sampling in addition to field investigation surrounding prioritised areas of interest.
During the Quarter, geologists were on ground at the recently acquired Yardea and Nonning South tenements undertaking targeted soil sampling and mapping activities. Soil samples have been dispatched to
the laboratory for analysis with results expected before the end of 2023.
Application was made for ELA2023/36 Eurilla Hill, a tenement to the west of Investigator’s Uno/Morgans/Harris Bluff package of tenements.
Earn-In to Molyhil Tungsten-Molybdenum Project
Investigator have entered into a staged Earn-In Agreement with Thor Energy PLC (Thor, ASX & AIM: THR)
to acquire up to 80% of their permitted Molyhil Tungsten Project in Northern Territory5.
During the Quarter, planning and preparation for both the resource confirmatory drilling and regional gravity survey have been finalised.
5 - ASX 24 November 2022: Strategic Earn-In on Molyhil Tungsten Project
Page | 12
ASX Release – Investigator
Quarterly Activities Report
30 September 2023
All regulatory documentation supporting these planned activities have been submitted, with commencement of drilling anticipated in late October and the gravity program in early November.
With a previously reported Mineral Resource Estimate6 of 4.38Mt @ 0.27% WO3 and 0.10% Mo for 11.8kt
WO3 and 4.4kt Mo (JORC 2012) and positive Definitive Feasibility Study7 results, the Molyhil Project has
been granted Major Project Status8 by the NT Government which will facilitate the project’s regulatory
approvals.
During the Quarter preliminary process plant design reviews commenced. These will be supported by a
planned metallurgical test work program based on samples generated from both the planned resource
drilling and collection of samples from the extensive stockpile of material at Molyhil previously generated
from a mined underground bulk sample.
Molyhil Gravity Program
As part of Investigator’s approach of undertaking both sophisticated and systematic exploration over the
Molyhil tenement, a high-resolution gravity survey will be undertaken across the Molyhil Project and surrounding area. The survey, to be conducted on spacings varying from 200m x 100m, down to 20m x 40m
in some areas, will provide data to facilitate regional stratigraphic and structural interpretations, supporting
target identification over a broad area surrounding the Molyhil deposit. Used in conjunction with magnetic
interpretation, this will enable identification and ranking of targets for future drill testing. A contractor has
been appointed with survey work planned to commence in early November.
CORPORATE
Cash
The Company held $3.3 million cash in Company bank accounts at 30 September 2023.
Corporate Disclosure and Reporting
In the attached Appendix 5B, the figure of $170,000 (as disclosed in section 6.1) relates to all fees, salaries
and superannuation paid to Investigator’s Directors for the September 2023 Quarter.
TENEMENTS
One new tenement within the East Eyre region was applied for during the Quarter.
Following strategic review, tenement EL6226 (Screechowl) was not renewed.
Investigator’s tenement holdings at the end of the Quarter are detailed in the table below.
6 – As reported by THR to the ASX 8 Apr 2021
7 – As reported by THR to the ASX 23 Aug 2018
8 – As reported by THR to the ASX 6 July 2020
Page | 13
ASX Release – Investigator
Quarterly Activities Report
30 September 2023
Page | 14
ASX Release – Investigator
Quarterly Activities Report
30 September 2023
UPCOMING NEWS AND RESULTS
In the December Quarter, Investigator anticipates releasing the following information to the ASX:
Commencement of drilling activities at the Molyhil Tungsten Project.
Commencement of gravity surveying at the Molyhil Tungsten Project
Results from the East Eyre soil; sampling program.
Results from the hydrological test work and modelling at Paris and Hector paleochannel.
Further metallurgical outcomes from Paris recovery enhancement and optimisation studies.
For and on behalf of the board.
Andrew McIlwain
Managing Director
For more information:
Andrew McIlwain
Peter Taylor
Managing Director
Media & Investor Relations
Investigator Resources
NWR Communications
+ 61 (0) 8 7325 2222
+ 61 (0) 412 036 231
amcilwain@investres.com.au
peter@nwrcommunications.com.au
About Investigator Resources
Investigator Resources Limited (ASX: IVR) is a metals explorer with a focus on the opportunities for silver-lead, copper-gold and
other metal discoveries. Investors are encouraged to stay up to date with Investigator’s news and announcements by registering
their interest here: https://investres.com.au/enews-updates/
Capital Structure (as at 30 Sept 2023)
Directors & Management
Shares on issue
1,437,170,017
Dr Richard Hillis
Non-Exec. Chair
Listed Options
232,108,085
Mr Andrew McIlwain
Managing Director
Unlisted Options
28,500,000
Mr Andrew Shearer
Non-Exec. Director
Top 20 shareholders
31%
Ms Anita Addorisio
CFO & Company Secretary
Total number of shareholders
5,479
Page | 15
ASX Release – Investigator
Quarterly Activities Report
30 September 2023
Competent Person Statement
The information in this release relating to exploration results is based on information compiled by Mr. Jason Murray who is a fulltime employee of the company. Mr. Murray is a member of the Australian Institute of Geoscientists. Mr. Murray has sufficient
experience of relevance to the styles of mineralisation and the types of deposits under consideration, and to the activities undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. Murray consents to the inclusion in this
report of the matters based on information in the form and context in which it appears.
The information in this release that relates to Mineral Resources Estimates at the Paris Silver Project is extracted from the release
titled “Paris Mineral Resource Estimate Update” dated 5 July 2023 and is available to view on the Company’s website www.investres.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from the original
market announcement.
The information in this release that relates to Pre-Feasibility Study undertaken on the Paris Silver Project is extracted from the
release titled “Paris PFS Delivers Outstanding Results” dated 30 November 2021 and is available to view on the Company’s
website www.investres.com.au. The Company confirms that it is not aware of any new information or data that materially affects
the information included in the original market announcement and that all material assumptions and technical parameters underpinning the results in the relevant market announcement continue to apply and have not materially changed.
No new information is presented in this release relating to the Molyhil Project.
All references to Molyhil Mineral Re