Encouraging results from Paris Lead recovery test work
Released
Released
Announcement PDF
ASX: IVR
ASX ANNOUNCEMENT
15 February 2024
Paris Silver Project – Lead Recovery Test Work Completed
Investigator Resources Limited (ASX: IVR, “Investigator” or the “Company”) is pleased to announce
the completion of the comprehensive metallurgical test work program targeting recovery of lead from the
Paris Silver Project’s Mineral Resource Estimate. As a key input to the Definitive Feasibility Study (DFS)
currently underway, completion of this test work enables the evaluation of the feasibility of lead recovery
and additional revenue to the Project’s economics.
Highlights:
Encouraging results support a baseline for production of a blended lead concentrate.
Lead flotation test work confirmed concentrate grades of up to 39% lead from sulphide rich
zones.
Promising recovery of lead from transition and oxide zones by selective flotation confirmed.
Further work to be undertaken to evaluate the distribution of lead zones within the Paris
Mineral Resource to define opportunity for inclusion of a lead recovery circuit in Paris Silver
Project’s DFS.
The potential to add revenue from lead concentrate sales could improve the economics of
the “silver-only” scenario considered in previous studies.
Investigator’s Managing Director, Andrew McIlwain commented in relation to the test work results:
“A critical component of the Paris DFS, results from the lead recovery test work undertaken at
ALS’s Burnie laboratory will now enable our technical team to determine the opportunity to improve the Project’s economics through the recovery of lead.
“Previous work had identified that lead recovery from the Paris resource was challenging given
the various forms in which lead appears. With the comprehensive work undertaken over the last
few years we have a better understanding of, and the ability to determine the distribution of the
numerous mineral occurrences of lead, enabling us to model and test recoveries.
“With these results we will consider how the respective zones are scheduled and mined, and that
processing of higher value lead ores will most likely be undertaken on a campaign basis.
“There is a real opportunity that revenue from lead recovery will add to the Project’s economics”.
Paris Silver Project – overview of the lead opportunity
The Paris Silver Project Pre-Feasibility Study (PFS), completed in 20211 was premised on the scenario of
a “Silver-Only” production flowsheet. This was to demonstrate the Project’s viability without reliance on by1 - ASX announcement 30 November 2021 – Paris PFS Delivers Outstanding Results
Page | 1
ASX Release – Investigator
Paris Silver Project – Lead recovery test work completed
15 February 2024
products credits from other mineralisation. A key opportunity to provide growth in revenue and overall
project value was always acknowledged in identifying a process for recovery of the lead (Pb) contained (in
addition to the silver) in the Mineral Resource Estimate (MRE). The Paris Project MRE is 24Mt at 73g/t
Ag and 0.41% Pb, for total contained 57Moz silver and 99kt lead2 (Table 1).
One aspect of the DFS currently underway was to evaluate the potential to maximise recovery of lead to
allow inclusion in a revised optimised flowsheet for the Paris Project. The addition of a lead circuit would
logically impact the capital and operating cost assumptions presented in the “Silver-Only” PFS, in addition
to potential changes in the mine schedule, percentage of the resource mined and total Project revenues.
Whilst the contained value of lead in the estimated Resource is modest in comparison to the contained
silver value, it has potential if recoverable through flotation to a saleable product to offset some of the
capital costs and improve overall Project value.
Lead mineralisation in the Paris MRE occurs in different forms, contained within sulphide minerals as
galena (PbS) and as oxide forms such as coronadite (Pb(Mn4+6Mn3+2)O16), anglesite (PbSO4) and
plumbogummite (PbAl3(PO4)(PO3OH)(OH)6). The distribution of these minerals will be defined by variability analysis in the DFS, however preliminary metallurgical assessment has been constrained to three
broad composites, including primary lead sulphide mineralisation (galena rich), transition zones (mixed
galena and lead oxide minerals) and oxide zones (lead oxide rich).
Metallurgical Test Work Program
A program of flotation test work was undertaken at ALS Burnie on eight composite samples generated to
include a selection of the three lead zones. Composites were obtained utilising material collected from the
drilling undertaken in 2023 and utilised within the 2023 Mineral Resource Estimate. Composites were
selected based on representative lead concentration. Test parameters were determined to focus on flotation of the major lead host mineral in each composite.
The goal of this program was to provide inputs of lead recovery and target concentrate grade that could
be included in refinements of the mineral process flowsheet and subsequent mine optimisation and financial modelling of the Paris Project.
Based on the outcomes of the lead recovery optimisation test work completed, additional modelling of data
within the Mineral Resource will be undertaken to determine what proportion of material could be included
in future mine plans for processing in a lead recovery circuit.
The results of the preliminary test work have been summarised in Table 2, below.
2 - ASX announcement 5 July 2023 – Paris Mineral Resource Estimate Update
Page | 2
ASX Release – Investigator
Paris Silver Project – Lead recovery test work completed
15 February 2024
Table 2 – Preliminary metallurgical results from sulphide rich and oxide rich composite samples.
Flotation test work on Composite 8, a sample with a higher proportion of lead sulphide mineralisation,
resulted in a lead recovery of 52% and a predicted concentrate grade of 39% Pb. This composite contained 36% of lead as galena, with the balance as anglesite and plumbogummite (see Table 3).
Composite 4 was selected from areas identified to contain lead oxide mineralisation. Metallurgical test
work undertaken in 2018 had identified lead hosted within coronadite and plumbogummite. Table 3 shows
that for the composites analysed in this current program, plumbogummite was confirmed as the dominant
oxide mineral.
Table 3 – Summary of composite mineralogical distribution by QXRD.
Successful flotation of oxide mineralisation requires different conditions to sulphide flotation. The test work
program examined various flotation configurations and reagent schemes to determine the response of
lead oxide minerals. The best results were achieved in T51 with 17.3% lead recovered to a concentrate
containing 15.9% lead.
While further work will be identified to improve both recovery and concentrate grade, the results were
encouraging in that a concentrate, albeit low-grade, could be generated from the lead oxide dominated
zones.
Page | 3
ASX Release – Investigator
Paris Silver Project – Lead recovery test work completed
15 February 2024
Conclusion
The results provide the Company with encouraging inputs for inclusion of a batch flotation circuit in the
process flowsheet at the Paris Project. This would give the opportunity to produce a blended concentrate,
containing lead and silver for sale. The silver recovered to lead concentrate would be anticipated to represent a small proportion of total silver recovery given low association of silver with galena, with final
distribution to be determined through the DFS program. Whether the recovery of some silver to a lead
concentrate through flotation, as described above, improves overall silver recoveries is yet to be determined. The majority of silver remains to be recovered through gravity and leaching, finally producing dore
bars on-site (as detailed in the PFS1).
The next phase of this work will be to interrogate the Mineral Resource Estimate and geological model to
determine what proportion of the Mineral Resource could be processed to produce an optimised lead and
silver concentrate. It is not expected that the entire Mineral Resource Estimate will be amenable to lead
recovery, however the DFS will assess whether an adequate proportion would be recoverable and add
overall value to the Project.
These results provide the Company an opportunity to consider inclusion of a batch flotation circuit in the
DFS assessment, with potential to produce a blended lead concentrate from a proportion of the total Mineral Resource estimated at Paris.
Next Steps
Utilising broader data compiled as part of the current silver variability test work phase of work for the
DFS study, the deposit will be modelled based on lead and accessory mineral composition to define areas with recovery classification of sulphide, transitional or oxide material for lead. These models will be
assigned appropriate recovery estimates and will allow for incorporation into mine optimisation studies.
For more information:
Andrew McIlwain
Peter Taylor
Managing Director
Media & Investor Relations
Investigator Resources Ltd
NWR Communications
+ 61 (0) 8 7325 2222
+ 61 (0) 412 036 231
amcilwain@investres.com.au
peter@nwrcommunications.com.au
About Investigator Resources
Investigator Resources Limited (ASX: IVR) is a metals explorer with a focus on the opportunities for silverlead, copper-gold and other metal discoveries. Investors are encouraged to stay up to date with Investigator’s news and announcements by registering their interest here: https://investres.com.au/enews-updates/
Capital Structure (as at 31 January 2024)
Directors & Management
Shares on issue
1,583,879,574
Dr Richard Hillis
Non-Exec. Chair
Listed Options
318,091,182
Mr Andrew McIlwain
Managing Director
Unlisted Options
28,500,000
Mr Andrew Shearer
Non-Exec. Director
Top 20 shareholders
29.5%
Ms Anita Addorisio
CFO & Company Secretary
Total number of shareholders
5,562
Total number of optionholders
256
Page | 4
ASX Release – Investigator
Paris Silver Project – Lead recovery test work completed
15 February 2024
Competent Person Statement
The information in this announcement relating to metallurgical results is based on information compiled by
Dr. William Goodall who is a consultant to the company. Dr. Goodall is a member of the Australian Institute
of Mining and Metallurgy (AusIMM) and a Chartered Professional (Metallurgy) with the Australian Institute
of Mining and Metallurgy. Dr. Goodall has sufficient experience of relevance to the commodities and
process flow sheets under consideration, and to the activities undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr. Goodall consents to the
inclusion in this report of the matters based on information in the form and context in which it appears.
The information in this announcement relating to exploration results is based on information compiled by
Mr. Jason Murray who is a full-time employee of the company. Mr. Murray is a member of the Australian
Institute of Geoscientists. Mr. Murray has sufficient experience of relevance to the styles of mineralisation
and the types of deposits under consideration, and to the activities undertaken, to qualify as a Competent
Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. Murray consents to the
inclusion in this report of the matters based on information in the form and context in which it appears.
The information in this release that relates to Mineral Resources Estimates at the Paris Silver Project is
extracted from the release titled “Paris Mineral Resource Estimate Update” dated 5 July 2023 and is available to view on the Company’s website www.investres.com.au. The Company confirms that it is not aware
of any new information or data that materially affects the information included in the original market announcement and that all material assumptions and technical parameters underpinning the estimates in the
relevant market announcement continue to apply and have not materially changed. The company confirms
that the form and context in which the Competent Person’s findings are presented have not been materially
modified from the original market announcement.
Page | 5
ASX Release – Investigator
Paris Silver Project – Lead recovery test work completed
15 February 2024
APPENDIX 1: JORC Code, 2012 Edition – Table 1
The following section is provided to ensure compliance with the JORC (2012) requirements for the reporting of the
Lead Metallurgical Outcomes, 2024, in the ASX release “Paris Silver Project – Lead Recovery Test Work Completed”,
dated 15 February 2024.
Assessment and Reporting Criteria Table Mineral Resource – JORC 2012
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling
techniques
Nature and quality of
sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to the minerals under
investigation, such as
down hole gamma
sondes, or handheld XRF
instruments, etc). These
examples should not be
taken as limiting the
broad meaning of sampling.
Include reference to
measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation
that are Material to the
Public Report.
In cases where ‘industry
standard’ work has been
done this would be relatively simple (e.g. ‘RC
drilling was used to obtain 1 m samples from
which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In
other cases more explanation may be required,
such as where there is
coarse gold that has inherent sampling problems. Unusual commodities or mineralisation
types (e.g. submarine
Commentary
Reverse Circulation (RC) Drilling
RC drilling was sampled at nominal 1m intervals down hole.
Where dry samples were intersected, sampling was undertaken
using a stand-alone riffle splitter. Approximately 3kg of the original sample volume was submitted to the laboratory for assay as
part of resource estimation and subsequent use in sub sampling
for the metallurgical program reported.
Sample splitting was undertaken as a separate process to drilling
(no rig attached splitter) to minimise contamination. Separate
records of sample weight in addition to whether dry processing or
drying prior to processing occurred for all samples in this program.
Remnant material remaining from each 1m drilled interval post
splitting was retained in large format green plastic sample bags
on site for subsequent usage and was the primary source of material for the reported metallurgical studies in this release.
Sampling selection and collection was based on whole of remnant 1m interval material for each drillhole and was based on
identification of representative mineralised intervals of lead down
hole and included zones of higher and lower grade lead material.
This sample selection was based on prior assay data used in the
2023 Paris Mineral Resource Estimate (MRE).
Sample material selected formed part of the Paris MRE and was
selected based on mineralogy, in addition to fitting requirements
to be of variable oxidation states and within the Paris deposit
mineral resource footprint and therefore material that was likely to
be mined for the purpose of studies.
Selected intervals also considered additional gangue mineralogy
(eg Mn, S) to ensure appropriate zones of sulphide and oxide
material were present.
Bulk 1m samples collected were weighed and compared to original sampling weights at time of splitting for analytical analysis
and original laboratory weighed sample records to verify correct
interval in addition to checking down hole interval depth on bags
in field.
Material sampled for this program totalled 911kg, with subsampled composites varying in a range between 66kg and 193kg.
RC material from the most recent 2022/2023 drill program was
selected on the basis that it was the most “fresh” representative
sample available, with lower opportunity for oxidative effects
compared to drill core and other sample that was older.
Other Aspects:
For additional information on prior Paris MRE’s refer to ASX
Page | 6
ASX Release – Investigator
Criteria
Paris Silver Project – Lead recovery test work completed
JORC Code explanation
15 February 2024
Commentary
nodules) may warrant
disclosure of detailed information.
Paris Mineral Resource estimate releases dated 5 July 2023, 28
June 2021, 19 April 2017, 9 November 2015 and 15 October
2013.
No other aspects for determination of mineralisation that are material to the public report have been used.
Drilling
techniques
Drill type (e.g. core, RC,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard
tube, depth of diamond
tails, face-sampling bit or
other type, whether core
is oriented and if so, by
what method, etc).
Paris Project Reverse Circulation Drilling:
Drill sample recovery
Method of recording and
assessing core and chip
sample recoveries and
results assessed.
Reverse Circulation Drilling
For all RC drilling in 2022-23 drilling program (relating to this release) sample recovery weights were recorded at the time of drilling. Wet or dry sample interval details were also recorded. Bag
weights for designated wet samples were taken after drying of intervals, with the majority of intervals in the program having a dry
bag weight recovery value. Moist but splitable bag weights were
weighed at the time of splitting and will not be a dry weight record.
2022/23 QA/QC analysis of RC recovery vs grade found 94.0%
of bag weights were within +/-2SD of the mean, and 71.5% within
+/-1SD of the mean.
RC bag weights were compared to expected weight using 1m
volume and average oxidation density. This identified a slightly
lower than expected RC drill recovery. This has been attributed
to drilling within a predominant friable, fine fraction dominant transition and oxide domain.
Plots of assay vs bag weight for all Paris RC drill data identified a
slight bias between higher grades and lower sample volume, attributed to the friable nature of the mineralised breccia zone.
Measures taken to maximise sample recovery
and ensure representative nature of the samples.
Whether a relationship
exists between sample
recovery and grade and
whether sample bias may
have occurred due to
preferential loss/gain of
fine/coarse material.
2022-2023 RC drilling programs were completed using 5 5/8 inch
face sampling hammers, with holes being a combination of vertical and inclined in orientation.
RC drilling did not utilise a rig attached splitter due to the potential for cross contamination should balling clay or similar intervals
be intersected. Drillers supplied sample on a per metre basis into
large format numbered sample bags.
General:
Observed poor and variable recovery is recorded in the sampling
database. Wet or moist samples are also recorded in the sampling database (for RC).
Selective twinning of a representative number of holes with diamond drilling was undertaken to support recovery/grade observations and appropriateness of method, for both the 2016 and 2020
resource drill programs. 2016 DD vs RC twin comparison confirmed overall comparable zones of mineralisation. 2020 DD vs
RC twin comparison in some areas was less consistent due to
geological and some DD core recovery issues. Plots of total average grade for RC vs DD twin pairs for 2016 and 2020 drilling
showed a slight bias towards RC in the majority of holes, however not regarded as a material difference, with the majority of
holes plotting within +/-10% of a 1:1 relationship. 2016 data was
more consistent than 2020 and attributed to higher core quality
Page | 7
ASX Release – Investigator
Criteria
Logging
Paris Silver Project – Lead recovery test work completed
JORC Code explanation
Commentary
Whether core and chip
samples have been geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
and some differences in geological ground conditions.
No diamond twin holes were drilled during the 2022-2023 RC drill
programs on the basis of prior QA/QC work supporting the RC
method which was in the same format, and small program size.
Entire holes are logged comprehensively and photographed on
site.
Qualitative logging includes lithology, colour, moisture content
(RC), sample volume (RC), mineralogy, veining type and percentage, sulphide content and percentage, description, marker horizons, weathering, texture, alteration, mineralisation, and mineral
percentage.
Quantitative logging includes magnetic susceptibility, specific
gravity (DD only), geotechnical parameters (DD only). Portable
XRF is utilised on an informal basis to identify zones of mineralisation and mineralogical components to assist in lithological logging but not relied upon for reporting of mineralisation in this release.
Whether logging is qualitative or quantitative in
nature. Core (or costean,
channel, etc) photography.
Sub-sampling techniques and
sample
preparation
15 February 2024
The total length and percentage of the relevant
intersections logged.
If core, whether cut or
sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether
sampled wet or dry.
For all sample types, the
nature, quality and appropriateness of the sample preparation technique.
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
Reverse Circulation Drilling
RC drilling was sampled at nominal 1m intervals.
Where dry samples were intersected, sampling was undertaken
using a stand-alone riffle splitter. Approximately 3kg of the original sample was submitted to the laboratory for assay. With remaining sample (split rejects) returned to large format green bags
and stored in down hole order for future sub sampling if required
on site.
Riffle splitters were visually inspected prior to drilling to confirm
appropriate construction and fitness for purpose. 87.5/12.5%,
75/25% and 50/50% splitters were utilised dependent on original
sample volume – final percentage split of all samples was recorded.
RC drill holes that encountered wet samples were quarantined
and dried prior to sub-sampling as per dry sub samples, i.e., riffle
split to obtain an approximate 3kg sample submitted to the laboratory for pulverisation and assay.
Field duplicates were taken on every 20th sample in the program
as part of MRE QA/QC procedures.
Metallurgical Sub Sampling:
Measures taken to ensure that the sampling is
representative of the in
situ material collected, including for instance results for field duplicate/second-half sampling.
Whether sample sizes
Sub samples were identified using logged lithology, lead and silver content and a number of additional elements available from
analytical data generated as part of the 2023 Paris MRE to inform gangue and potential oxidation vs sulphide dominant mineralisation.
Sub sampled intervals were based on selection and identification of representative lead mineralised intervals that were dominated by sulphide mineralisation (lead and high sulphur) or oxide mineralisation (lead with lower sulphur and elevated Mn, P).
Samples were differentiated on this basis.
Identified samples were located in the field, re-weighed to assist
Page | 8
ASX Release – Investigator
Criteria
Paris Silver Project – Lead recovery test work completed
JORC Code explanation
15 February 2024
Commentary
are appropriate to the
grain size of the material
being sampled.
in verification securely sealed with cable tie, catalogued and deposited into steel drums in preparation for transportation to the
selected metallurgical laboratory.
Samples supplied to the laboratory were “whole of bag” ie all
remnant material remaining from the 1m sampled interval retained after splitting for analytical analysis as part of the 2023
MRE.
A spreadsheet list of sample number and weight was provided
to the laboratory in advance of delivery to allow cross checks
and validations as part of sample receipt.
Sample weights selected averaged 26.8kg with a minimum
sample of 7kg and maximum sample of 45kg weight.
A total of 34 samples were sub sampled for the test work.
Lead from analytical assays in 2023 as part of MRE for 1m intervals varied from in a range from 0.15% to 8.98% lead.
Consultant metallurgists, MinAssist undertook further characterisation analysis of the samples existing multi-element geochemistry in order to identify a total of 8 composite aggregates of
samples based on lithology and chemical differentiations.
The 8 Composite samples were supplied to the nominated metallurgical laboratory, ALS (Burnie, Tas) with composite number
and an associated listing of unique sample numbers representing 1m intervals for that composite.
Laboratory sample preparation
The analytical laboratory received all samples and verified sample number and weight.
Unique sample numbers were composited by the laboratory as
per supplied composite interval information provided by IVR’s
consultant metallurgists, MinAssist.
Samples were blended for homogeneity and riffle split in accordance with laboratory procedures in advance of further test work.
The nature, quality and appropriateness of the sampling technique is considered appropriate for the grainsize and type of mineralisation and confidence level being attributed to the results
presented.
Quality of
assay data
and laboratory tests
The nature, quality and
appropriateness of the
assaying and laboratory
procedures used and
whether the technique is
considered partial or total.
For geophysical tools,
spectrometers, handheld
XRF instruments, etc, the
parameters used in determining the analysis including instrument make
and model, reading
times, calibrations factors
applied and their derivation, etc.
A certified and NATA accredited commercial laboratory ALS Laboratories (ALS) (Burnie, Tasmania) was used for all assays and
metallurgical test work.
Assay data used to select metallurgical samples:
Samples were analysed using methods MEMS61 and MEMS61r
with a 25g prepared sample subjected to a 4-acid total digest
with perchloric, nitric, hydrofluoric and hydrochloric acids and analysed by ICP-AES and ICP-MS for 48 elements including Ag
and Pb.
Over-range samples (>100ppm Ag, >1% Pb) were re-assayed
using ME-OG62, 4-acid total digest with ICP-AES finish to
1,500ppm Ag and 20% Pb.
Umpire checks and QAQC processes by IVR and analytical laboratory can be found by referring to IVR ASX release 5 July
2023 - for the Paris Mineral Resource Estimate.
Page | 9
ASX Release – Investigator
Criteria
Paris Silver Project – Lead recovery test work completed
JORC Code explanation
15 February 2024
Commentary
Laboratory Techniques and QAQC for Metallurgical Test work
Nature of quality control
procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been
established.
Verification
of
sampling
and assaying
The verification of significant intersections by either independent or alternative company personnel.
The use of twinned holes.
Characterisation of composited samples occurred by assay of
each composite by XRF Fusion and XRD analysis.
Grind establishment for all composites occurred targeting 53, 75
and 106 microns
Particle size distribution and assay by XRF fusion was undertaken for all composites on both 53 and 75 micron sub samples.
Sulphide flotation for all composites at 106 micron P80 and 75micron P80 and P80 of 53 micron undertaken using open circuit
rougher flotation test, float concentration analysis by XRF Fusion.
Composites with sulphide rich samples were tested by sequential
rougher, cleaner and scavenger flotation, with assessment of regrind effects and sulphidisation to promote flotation of Pb oxide
minerals.
Composites with oxide rich samples were tested by rougher,
cleaner and scavenger flotation with sulphidisation to promote
flotation of Pb oxide minerals.
Analytical bias was assessed by comparison of assayed head
grade to calculated grade from flotation tests. No significant analytical bias was noted.
No new intersections are reported in this release.
All historic assay or geological data utilised to select samples has
been discussed and reviewed as part of the 2023 MRE refer ASX
5 July 2023.
All assay data used to select composites is securely stored within
Maxgeo Datashed5 database which is cloud hosted under contract with secure login and access.
No adjustment to assay data occurred as part of sample selection.
Composite sample mineralogy was able to be compared with
weighted average original assay grades to confirm similar inputs
and accuracy of material used in metallurgical test work.
Documentation of primary
data, data entry procedures, data verification,
data storage (physical
and electronic) protocols.
Location
of
data
points
Discuss any adjustment
to assay data.
Accuracy and quality of
surveys used to locate
drill holes (collar and
down-hole surveys),
trenches, mine workings
and other locations used
in Mineral Resource estimation.
Specification of the grid
system used.
Quality and adequacy of
topographic control.
Not relevant to the test work undertaken and reported in this release which is on subsampling of previously reported drill data.
For information on this, refer to ASX 5 July