Molyhil Sale Completed
Released
Released
Announcement PDF
Investigator Silver Limited | ABN: 90 115 338 979 | 47 King St, Norwood SA 5067 Australia | ASX: IVR | www.ivrsilver.com.au Page | 1
19 January 2026
Molyhil Sale Completed
$750,000 Completion Payment Received; Deferred Payments Retained
Investigator Silver Limited (ASX: IVR) (“Investigator” or the “Company”) is pleased to advise that the
divestment of its 25% interest in the Molyhil Tungsten–Molybdenum Project in the Northern Territory
(the “Transaction”) to Tivan Limited (ASX: TVN) (“Tivan”) has completed, and Investigator has received
the $750,000 completion payment.
Highlights
• Completion achieved for the sale of Investigator’s 25% interest in the Molyhil Project to Tivan
(alongside joint venture partner Thor Energy Plc).
• $750,000 completion payment received by Investigator.
• Investigator retains rights to further deferred consideration totalling $1,312,500, payable in three
equal annual instalments (with 50% able to be paid in shares at Tivan’s election, as previously
disclosed1).
• The Transaction represents continued portfolio rationalisation, freeing capital and management
attention to advance Investigator’s Paris Silver Project and aligned precious metals opportunities.
Managing Director’s Comment
Investigator Silver Managing Director, Lachlan Wallace, said:
“Completion of the Molyhil divestment and receipt of the completion payment represents
another tangible step in the ongoing rationalisation of our portfolio. The Transaction
crystallises value from a non-core asset and further sharpens our focus on precious metals,
with the Paris Silver Project at the centre of our efforts.”
1
ASX Announcement 16 Sep 2025: Molyhil Sale Crystallises Value and Sharpens Precious Metals Focus
ASX Release – Investigator Silver
Page | 2
Transaction Update
As previously announced on 16 September 2025, Investigator entered into a binding term sheet with Tivan
for the divestment of its 25% interest in the Molyhil Project, with staged consideration of up to
A$2,187,500.
Following satisfaction of conditions precedent, the Transaction has now completed, and Investigator has
received the A$750,000 completion payment, bringing total upfront cash received under the Transaction
to A$875,000 (deposit plus completion).
Investigator remains entitled to the following deferred payments, with 50% of each deferred payment
payable in cash or shares at Tivan’s election:
• A$437,500 at 12 months after signing
• A$437,500 at 24 months after signing
• A$437,500 at 36 months after signing
Strategic Context
The completion of the Molyhil divestment is consistent with Investigator’s strategy to streamline the
portfolio and focus on its core precious metals growth platform, centred on the Paris Silver Project. The
Company is progressing Paris through the next phase of evaluation and development, supported by a
simplified asset base and strengthened balance sheet.
For and on behalf of the board.
Lachlan Wallace
Managing Director
For further information, please contact:
Lachlan Wallace
Managing Director
+ 61 (0) 8 7325 222
lwallace@ivrsilver.com.au
ASX Release – Investigator Silver
Page | 3
About Investigator Silver
Investigator’s 100% owned Paris Silver Project is located 70km north of the rural township of Kimba on
South Australia’s Eyre Peninsula. The Paris Silver Project, with a JORC 2012 resource of 24Mt @ 73g/t
silver and 0.41% lead for 57Mozs silver and 99kt lead, is a shallow high-grade silver deposit amenable to
open pit mining, providing outstanding exposure to a metal with strong commodity, renewable energy
and manufacturing demand.
With positive outcomes of the Paris Project’s Pre-Feasibility Study as reported in November 2021, the
company is undertaking the work required to complete a Definitive Feasibility Study, whilst continuing to
progress exploration proximal to Paris and across adjacent significant ground holdings within South
Australia.
Competent Person Statement
The information in this announcement relating to the Mineral Resource Estimate is based on information
compiled by Mr. Jason Murray who is a full-time employee of the company. Mr. Murray is a member of
the Australian Institute of Geoscientists. Mr. Murray has sufficient experience of relevance to the styles
of mineralisation and the types of deposits under consideration, and to the activities undertaken, to
qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC)
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. Murray
consents to the inclusion in this report of the matters based on information in the form and context in
which it appears.
Paris Mineral Resource Estimate2
2023 Paris Silver Project Mineral Resource estimate (25g/t silver cut-off grade).
(Note: Total values may differ due to minor rounding errors in the estimation process)
1,2 ASX announcement 5 July 2023 “Paris Mineral Resource Estimate Update”. The Company confirms that it is not aware of any new infor-
mation or data that materially affects the information included in the original market announcement of 5 July 2023 and that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not
materially changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not
been materially modified from the original market announcement.
Share your feedback
Discover