As Thor Energy is 100% owner of the Molyhil Tungsten-Molybdenum-Copper Deposit and tenure, the
ASX have requested a full Mineral Resource Estimation Disclosure pursuant to ASX listing rule 5.8
2024 Mineral Resource Estimate Update
Molyhil Project, Northern Territory
The Directors of Thor Energy Plc (“Thor”) (AIM, ASX: THR, OTCQB: THORF) are pleased to announce
that ASX-listed Investigator Resources Limited (“IVR”), farming-in to the Molyhil Project has completed
an updated Mineral Resource Estimate (“MRE”) for the Molyhil Tungsten-Molybdenum-Copper
Deposit, located in the Northern Territory (Figure 1).
Highlights:
▪ The Molyhil Mineral Resource Estimate now comprises 4.65Mt @ 0.26% WO3 (tungsten trioxide),
and 0.09% Mo (molybdenum) for 12.1kt WO3 and 4.4kt Mo (JORC 2012) (Table A).
▪ Investigator’s verification diamond drilling program has resulted in a significant improvement in
resource confidence, lifting significant tonnage into the higher Measured Resource Category.
▪ The Measured Resource Category of the Molyhil Tungsten-Molybdenum Project improved with a
150% increase in tonnes and 20% increase in WO3 grade when compared to the previous Thor
2021 MRE (Table B) (ASX/RNS: THR 8 April 2021). Contained tungsten metal in the Measured
Resource Category increased by 200% to 3,945 tonnes.
▪ The recent renewal of Northern Territory Major Project status to Molyhil provides valuable
pathways to advance the project towards production.
▪ Thor currently hold 100% interest in the Molyhil deposit and tenure.
▪ Under the Heads of Agreement (“HoA”) (ASX/RNS 22 November 2022), Stage 1 completion has
given IVR the right to a 25% interest in the Molyhil Project and surrounding exploration tenure,
and also a 40% interest in the adjacent Bonya tenement. IVR can now elect to the transfer of a 25%
interest in the Tenements, and a Joint Venture (“JV”) with Thor will become effective, upon which
IVR will issue Thor $A250,000 in IVR shares, as per the HoA.
Nicole Galloway Warland, Managing Director of Thor Energy, commented:
“The targeted 12-hole diamond drilling program completed by IVR in December 2023, along with QAQC
validation of historic data, has provided a strong level of increased resource confidence, lifting tonnage
and increased tungsten grade to the higher Measured Resource category. This is a positive result for
the Project, and along with strong tungsten and molybdenum prices, it will be valuable for the scoping
study assessment to be undertaken by IVR early in the second half of 2024.
Based on the HoA, IVR is now entitled to a 25% interest in the Project and surrounding tenure, as such
Thor is looking forward to working with IVR to complete all documentation to effect the transfer and
form a JV.”
ASX: THR
The updated Mineral Resource Estimate (MRE) for the Molyhil Tungsten-Molybdenum Project is shown in Table
A below. A cut-off grade of 0.05% WO3 was selected, which is considered appropriate when taking into account
current commodity price strength and peer reporting comparisons. The MRE is reported to a 150mRL and based
on an open pit mining scenario.
Table A: Updated Molyhil Resource Estimate, reported at cut-off grade of 0.05% WO3 Tungsten as of 28 May
2024.
Notes:
1. 0.05% Cut-off
2. MRE reported to 150m RL
3. Based on Open Pit mining scenario
4. MRE was completed by Luke Burlet, Director H&S Consultants Pty Ltd
5. Variability of summation may occur due to rounding to appropriate level of significant figures.
Figure 1: Tenement & Prospect Location Plan
2
ASX: THR
2024 MINERAL RESOURCE ESTIMATE AND REPORTING CRITERIA
Introduction
The Molyhil tungsten-molybdenum-copper deposit is 100% owned by Thor and is located 220km north-east of
Alice Springs (320km by road) within the prospective polymetallic province of the Proterozoic Eastern Arunta
Block in the Northern Territory (Figure 1).
The deposit consists of two adjacent outcropping magnetite skarn bodies, the northern ‘Yacht Club’ lode and
the ‘Southern’ lode (Figure 2). Both lodes are marginal to a granite intrusion (Marshall Granite) and
Paleoproterozoic meta-carbonate rocks (Deep Bore Metamorphics).
Mineralisation occurs as massive and disseminated scheelite (CaWO4) powellite (CaMoO4), molybdenite (MoS2)
and chalcopyrite (CuS2) within the skarn unit. Both the outlines of the lodes and the banding within the lodes
strike approximately north, plunging steeply to the south and dip steeply to the east. Mineralisation remains
open at depth.
Thor executed an A$8m Farm-in and Funding Agreement through a HoA with Investigator Resources Limited
operating as Fram Ltd (Fram) (ASX: IVR) to accelerate exploration at the Molyhil Project on 24 November 2022
and the sale of Thor’s interest in the Bonya tenement (EL29701) (ASX/AIM: 24 November 2022). Under the HoA
(ASX/RNS 22 November 2022), Stage 1 expenditure of $1M completion has given IVR the right to a 25% interest
in the Molyhil Project and surrounding exploration tenure, and also a 40% interest in the adjacent Bonya
tenement. IVR can now elect to the transfer of a 25% interest in the Tenements, and a Joint Venture (“JV”) with
Thor will become effective upon which IVR will issue Thor $A250,000 in IVR shares, as per the HoA.
On entering the Heads of Agreement with Thor in 2022, Investigator engaged independent resource consulting
group H&S Consultants Pty Ltd (“HSC”) to assist with a gap analysis of the Molyhil Mineral Resource Estimate
reported by Thor in 2021. This identified both opportunities to improve confidence in the MRE classification and
exploit some areas of the resource with targeted drilling.
Investigator, in conjunction with HSC, devised a program of drilling aimed at Quality Assurance/Quality Control
(QA/QC) verification of the pre-existing data, via selective twinning of historic Reverse Circulation (RC) and
Diamond Drill (DD) holes and confirmatory drilling in areas of lower drill density. This drill program of 12
diamond holes (totalling 1,501 metres) was completed in December 2023. Significant intersections from this drill
program are included in Appendix 4
Data from historic drilling, in addition to Investigator’s newly acquired data, was provided to HSC to be utilised
by HSC to independently prepare the updated Molyhil MRE (Appendix 2).
Mineral Resource Estimate
HSC, following their due diligence review, recommended the use of Multiple Indicator Kriging (MIK) as a more
appropriate method of estimation for modelling the heterogeneous style of the Molyhil tungsten and
molybdenum mineralisation.
The tungsten and molybdenum resources were estimated by MIK method and are reported using E-type panel
estimates above tungsten cut-off grades. The copper resource estimate has been reported utilising Ordinary
Kriging (OK) methodology.
Estimates of resources are reported at a range of tungsten cut-off grades for open pit mining selectivity at
practical block dimensions of 10m x 5m x 10m (length x width x depth).
Given the near surface nature and geometry of the Molyhil mineralisation, the MRE has been undertaken on the
assumption that the deposit would be mined using open pit methods and HSC has modelled and classified the
resource accordingly.
3
ASX: THR
Acknowledging the improved tungsten and molybdenum prices and the cut-off grades adopted in peer opencut projects, coupled with the potential recovery improvements identified in the ore sorting study completed by
Thor in 2021, this updated MRE is reported at a 0.05% WO3 cut-off grade to the 150mRL level (a depth of 260m
below surface. 50m deeper than Thors 2021 MRE -Table B). Investigator considers that these parameters support
a resource of which there is reasonable prospect of eventual economic extraction.
In comparison, Thor’s Mineral Resource Estimate in 2021 (Table B), utilising Mixed Support Kriging used a 0.07%
WO3 cut-off grade to the 200mRL level (a depth of 210m) (as reported to the ASX on 8 April 2021).
Table A: Updated Molyhil Resource Estimate by Investigator, as of 28 May 2024 reported at cut-off grade of
0.05% WO3 Tungsten to 150mRL.
Notes:
1.
2.
3.
4.
Cut-off of 0.05% WO3
100% owned by Thor Energy Plc
Variability of summation may occur due to rounding to appropriate level of significant figures.
To satisfy the criteria of reasonable prospects for eventual economic extraction, the Mineral Resources
have been reported down to 150m RL which defines material that could be potentially extracted using
open pit mining methods.
Table B: Molyhil Mineral Resource Estimate by Thor as of March 31 2021, reported at a cutoff grade of 0.07%
WO3 Tungsten to 200m RL.
Note:
1.
2.
3.
4.
5.
0.07% WO3 Cut-off
Figures are rounded to reflect appropriate level of confidence.
Apparent differences may occur due to rounding.
100% owned by Thor Energy Plc
To satisfy the criteria of reasonable prospects for eventual economic extraction, the Mineral Resources
have been reported down to 200m RL which defines material that could be potentially extracted using
open pit mining methods.
4
ASX: THR
Classification
The updated Molyhil MRE for tungsten, molybdenum and copper has been classified as Measured, Indicated
and Inferred by HSC (Figure 3). The main mineralised domains have demonstrated sufficient continuity in both
geology and grade continuity to support the definition of a Mineral Resource, and the classifications applied
under the 2012 JORC Code.
Estimates for mineralisation within the main mineralised Lodes are tested by drilling spaced nominally at 25m x
25m in the more well-defined areas of the deposit, reducing to 5m to 15m spacing within selected parts of the
skarn where recent drilling by Investigator twinned older RC and DD holes to validate historic grades.
Confidence categories assigned to the estimates reflect qualitative panel criteria established by the resource
consultant, including but not limited to, number of drillholes, number of samples, QA/QC (surveys, standards,
duplicates etc.) within each individual panel of the block model.
HSC was supplied sufficient information to support the utilisation of the reported cut-off grade (0.05% WO3),
and lower depth of the MRE (150mRL), and HSC is satisfied with the assumptions and supportive information
provided, including metal price improvements, improvements in potential processing options and taking into
consideration improved confidence in the resource classification.
Domains
The deposit in hosted predominantly within two adjacent magnetite skarn bodies that overprint meta-carbonate
units of the Deep Bore Metamorphics (1805 ± 7 million years ago, Ma), the skarn is proximal to Marshall Granite
intrusions (1780-1710 Ma) and outcrops at surface. Main logged units at the deposit are magnetite skarn, calcsilicate and granite, additional minor lithologies include aplite dykes, quartz veins and fluorite/barite veins.
A nominal cut-off grade of 10-15% Fe2O3 was used to define the MREs constraining wireframe of the two main
skarn zones, the Yacht Club Lode and Southern Lode (Figure 2).
Data
The compiled drill hole database supplied to HSC by Investigator, supported by QA/QC reporting documentation,
comprises information from 121 drill holes (89 reverse circulation and 32 diamond drill holes) for an aggregate
total of 17,396m of drilling. Rotary Air Blast holes and other drilling prior to 2004 were used to inform the
geological modelling however assays from these sources were excluded from the up-dated MRE due to
insufficient QA/QC support.
Additionally, 3 shafts and 3 underground crosscuts for a total development length of 198m were completed in
2005 and verified geological and assay data from this source was utilised as part of this current MRE. These
underground workings had been developed to resolve differences between costean bulk sampling, which
supported historical mined grades, and historic RC drill hole grades.
One (1) newly drilled DD hole was designed to pass in close proximity to the northern cross-cut drive to assess
grade continuity. The results verified the previously sampled and reported grades observed in the cross-cut, and
in addition to the thorough assessment of methodology and QA/QC undertaken for the underground workings,
HSC and Investigator considered this data to be of sufficient quality for inclusion into the updated MRE.
Drill holes within the main mineralised lodes are predominantly inclined RC and DD holes, drilled in a westerly
orientation to intersect the north-south striking mineralised lodes. A small number of holes (4 in 2004, 1 in 2021
and 2 in 2019) were drilled in alternate orientations to assess the mineralisation distribution.
5
ASX: THR
A plan view showing the distribution of drilling over the Molyhil deposit (including the IVR 2023 drilling), in
relation to mineralisation constraining wireframes (Southern and Yacht Club Lodes) is shown in Figure 2.
Figure 2: Collar plan showing location of the 12 new diamond drill holes (yellow dots) informing the updated
MRE, with historic holes coloured by drill type. The two transparent wireframes display the plan view footprint
of mineralised Lodes.
6
ASX: THR
Figure 3 illustrates the updated Molyhil MRE block model for the two mineralised Lodes (Southern and Yacht
Club), with panels coloured by resource classification.
Figure 3: Updated MRE classification block model, (orange = Measured, yellow = Indicated, & blues = Inferred).
Blocks below the 150m plane on this figure are not reported as part of the updated MRE.
7
ASX: THR
Twin hole comparison from the 2023 (Investigator) drill program to Thors earlier drilling (Table C), showed broad
lithological and grade continuity in all elements, however mineralisation was seen to extend beyond the
historical skarn wireframe, likely due to the expanded sampling regime adopted by Investigator sampling 10m
into the granite, compared with the historic sampling which was restricted to the mineralised skarn. Despite the
good correlation with copper and molybdenum, tungsten displays greater variability, and was generally higher
grade in Investigator’s recently drilled diamond holes.
Table C: List of Downhole Twin Comparison study -comparing mineralisation from 2023 drilling (IVR) to earlier
Thor drilling.
2023 Drilling (IVR)
Historic Drilling (THOR)
IVRMHDD001
MHDD068
IVRMHDD007
MHDD073
IVRMHDD006
TMRC010
IVRMHDD005
07MHRC004
IVRMHDD011
TMRC015
Densities
Rock density was highlighted as an opportunity to improve on previous resource estimations. Dry bulk density
measurements for prior MREs were estimated utilising a linear (Y on X) iron (Fe) regression calculation to assign
density to each sample using specific gravity from a total of 69 RC Pycnometer samples analysed from 2 holes
only (1 each from Yacht Club and Southern Lodes, spaced 90m apart).
For the updated MRE, dry bulk densities were assigned to each sample within the mineralised lode wireframes,
allowing both the metals (WO3/Mo/Cu/Fe) and density to be modelled at the same search criteria. HSC
recommended the use of an alternate regression method - Reduced Major Axis, which takes into account the
‘error’ in both variables (Fe and density) and is considered better suited for this type of deposit. The iron
regression was used to populate density for each sample within the model but honoured actual field
measurements where present.
A sensitivity analysis was undertaken, whereby the density model was run an additional four times using three
alternate regression methods and using raw data alone. The results of all methods were similar, providing
confidence in the model, which supported the uplift in tonnes in the Measured classification, where the majority
of drilling and density data was available.
A section view showing the resource estimate classification block model defining the two mineralised lodes,
downhole geology for some of the 2023 drilling, and simplified geology in the background of image is shown in
Figure 4.
8
ASX: THR
Figure 4: Cross-section within Molyhil deposit showing summarised geology, 2023 drillholes and updated
resource classification block model. (Hole IVRMHDD007) is drilled oblique and does not terminate on section)
(sourced from IVR ASX 28 May 2024).
Appendix 1 contains “Table 1: Assessment and Reporting Criteria Table Mineral Resource – JORC 2012”, which
provides additional detail on the exploration data and updated Mineral Resource Estimate for the Molyhil
Tungsten Project
Appendix 2 – Appendix 4 contains Drill hole Collar information for MRE including IVR 2023 Diamond Drill Collars.
MINING AND METALLURGICAL WORK AND OTHER MATERIAL FACTORS
The Molyhil Deposit occurs in two adjacent skarn bodies that contain outcropping molybdenite and scheelite
mineralisation. Since mid-2004 it has been the subject of systematic test work comprising geophysical
exploration, diamond and RC drilling programmes, surface and underground bulk sampling, metallurgical test
work and a geotechnical study.
With the improved tungsten and molybdenum prices and the cut-off grades adopted in peer open-cut projects,
coupled with the potential recovery improvements identified in the Tomra ore sorting study completed by Thor
in 2021, this updated MRE is reported at a 0.05% WO3 cut-off grade to the 150mRL level (a depth of 260m below
surface).
It is considered that these parameters, along with the near surface nature and geometry of the Molyhil
mineralisation, that the MRE has been undertaken on the assumption that the deposit would be mined using
open pit methods and HSC has modelled and classified the resource accordingly.
9
ASX: THR
MARKET OUTLOOK
Tungsten
The majority of tungsten resources are located in China, Canada, Russia and the United States, with the main
consumer of tungsten China (about 50% of global tungsten demand), followed by the USA and Europe.
The outstanding and unique physical properties of tungsten (melting point/hardness/tensile strength) and lack
of substitutes makes tungsten critical in industrial, oil & gas, mining and agricultural applications and as such is
considered a strategic commodity in the USA, China & the European Union.
The global tungsten market is anticipated to rise steadily with surging demand for alloy in various end user
industries, including defence, electronics, automotive, mining, and petrochemical industries. With China
dominating production (approximately 83% of the world’s primary production) supply risk and domestic security
is adding to demand from the United States and allied countries.
On 27 May 2024, Argus Media indicate that the Tungsten APT Price CIF Rotterdam has increased to US$365$370/mtu (metric tonne unit). See Figure 5 for 5-year price trend.
Figure 5: 5 Year Price Chart for Tungsten ($/MTU WO3 – EU LOW). Data sourced from Fastmarkets Metal Bulletin
Molybdenum
Molybdenum is a key component of many of the higher quality stainless steels essential for construction,
transportation and energy sector, along with nickel, and can be substituted for a portion of the nickel component
when nickel prices are elevated. In consequence, when nickel prices climb, often molybdenum pricing will
follow.
The rising demand for steel alloy and molybdenum growth is associated with developing countries as a result of
increasing residential and commercial construction.
Much of global molybdenum supply is as co-product from several large porphyry copper mining operations.
Supply, therefore, can be somewhat non-elastic with over-supply in times where demand is weak, and
conversely under-supply when demand is high. See Figure 6 for 5year price trend.
10
ASX: THR
Figure 6: 5 Year Price Chart for Molybdenum (USD/Metric ton). Data sourced from ycharts.com
The Board of Thor Energy PLC has approved this announcement and authorised its release.
For further information, please contact:
THOR ENERGY PLC
Nicole Galloway Warland,
Managing Director
+61 8 7324 1935
nicole@thorenergyplc.com
Competent Person’s Report
The information in this announcement relating to exploration results, information informing Mineral Resources
and the reasonable prospects of eventual economic extraction of Mineral Resources is based on information
compiled by Mr. Andrew Alesci who is a full-time employee of the Investigator Resources Limited. Mr. Alesci is a
member of the Australian Institute of Geoscientists. Mr. Alesci has sufficient experience of relevance to the styles
of mineralisation and the types of deposits under consideration, and to the activities undertaken, to qualify as a
Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. Alesci consents to the inclusion in
this report of the matters based on information in the form and context in which it appears.
The information in this announcement that relates to Mineral Resource estimation is based on information
compiled by Mr Luke Burlet, who is a Member of The Australian Institute of Geoscientists. Mr Burlet is a director
of H&S Consultants Pty Limited and has sufficient experience which is relevant to the style of mineralisation and
type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person
as defined in the 2012 edition of the “Australasian Code for Reporting Exploration Results, Mineral Resources
and Ore Reserves”. Mr Burlet consents to the inclusion in the report of the matters based on his information in
the form and context in which it appears.
11
ASX: THR
Updates on the Company's activities are regularly posted on Thor's website which includes a facility to register
to receive these updates by email, and on the Company’s X page @thorenergyplc
About Thor Energy Plc
The Company is focused on uranium and energy metals that are crucial in the shift to a ‘green’ energy economy.
Thor has a number of highly prospective projects that give shareholders exposure to uranium, nickel, copper,
lithium and gold. Our projects are located in Australia and the USA.
Thor holds 100% interest in three uranium and vanadium projects (Wedding Bell, Radium Mountain and
Vanadium King) in the Uravan Belt in Colorado and Utah, USA with historical high-grade uranium and vanadium
drilling and production results.
At Alford East in South Australia, Thor has earnt an 80% interest in oxide copper deposits considered amenable
to extraction via In Situ Recovery techniques (ISR). In January 2021, Thor announced an Inferred Mineral
Resource Estimate¹.
Thor also holds a 26.3% interest in Australian copper development company EnviroCopper Limited (ECL), which
in turn holds rights to earn up to a 75% interest in the mineral rights and claims over the resource on the portion
of the historic Kapunda copper mine and the Alford West copper project, both situated in South Australia, and
both considered amenable to recovery by way of ISR.²³ Alligator Energy recently invested A$0.9M for a 7.8%
interest in ECL with the rights to gain a 50.1% interest by investing a further A$10.1m over four years.
Thor holds 100% of the advanced Molyhil tungsten project, including measured, indicated and inferred
resources⁴, in the Northern Territory of Australia, which was awarded Major Project Status by the Northern
Territory government in July 2020. Thor executed a A$8m Farm-in and Funding Agreement with Investigator
Resources Limited (ASX: IVR) to accelerate exploration at the Molyhil Project on 24 November 2022.6
Adjacent to Molyhil, at Bonya, Thor holds a 40% interest in deposits of tungsten, copper, and vanadium,
including Inferred resource estimates for the Bonya copper deposit, and the White Violet and Samarkand
tungsten deposits. ⁵ Thor’s interest in the Bonya tenement EL29701 is planned to be divested as part of the
Farm-in and Funding agreement with Investigator Resources Limited.6
Thor owns 100% of the Ragged Range Project, comprising 92 km2 of exploration licences with highly encouraging
early-stage gold and nickel results in the Pilbara region of Western Australia.
Notes
https://thorenergyplc.com/investor-updates/maiden-copper-gold-mineral-resource-estimate-alford-eastcopper-gold-isr-project/
2
www.thorenergyplc.com/sites/thormining/media/pdf/asx-announcements/20172018/20180222clarification-kapunda-copper-resource-estimate.pdf
³ www.thorenergyplc.com/sites/thormining/media/aim-report/20190815-initial-copper-resource-estimate--moonta-project---rns---london-stock-exchange.pdf
4
https://thorenergyplc.com/investor-updates/molyhil-project-mineral-resource-estimate-updated/
5
www.thorenergyplc.com/sites/thormining/media/pdf/asx-announcements/20200129-mineral-resourceestimates---bonya-tungsten--copper.pdf
6
https://thorenergyplc.com/wp-content/uploads/2022/11/20221124-8M-Farm-in-Funding-Agreement.pdf
1
The Company notes that for the relevant market announcements noted above, that it is not aware of any new
information or data that materially affects this information and that all material assumptions and technical
parameters underpinning any estimates continue to apply and have not materially changed.
12
APPENDIX 1: JORC Code, 2012 Edition – Table 1
The following section is provided to ensure compliance with the JORC (2012) requirements for the reporting of the updated Molyhil Resource Estimate, in
the ASX release “2024 Molyhil Mineral Resource Estimate” dated 31 May 2024
Assessment and Reporting Criteria Table Mineral Resource – JORC 2012
Mr Andrew Alesci, Senior Project Geologist for IVR compiled the information in Section 1 and Section 2 of JORC Table 1 in this Mineral Resource
report and is the Competent Person for those sections. Luke Burlet, Director H&S Consulting Pty Ltd is the Competent Person for Section 3.
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria and JORC Code explanation
Sampling techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
Commentary
Diamond Hole (DD) Drilling
•
Investigator Resources Ltd (IVR) 2023 DD program was undertaken with HQ2 size core drilled
for all 12 holes completed in the program, totalling 1,501 metres.
•
Historic diamond drilling contained within this resource consists of mainly HQ core with small
contribution of PQ, comprising 20 holes for 3,002.5 metres (195.6m PQ, 2,806.9 HQ)
•
IVR Diamond drilling was sampled at nominal 1m intervals down hole (88% at 1m for IVR
drilling), or to geological boundaries, with “from” – “to” intervals recorded against sample number.
•
Historic sampling was reported as at nominal 1m intervals down hole (70% at 1m for historical
drilling) or to geological boundaries resulting in some shorter and longer intervals, with only
mineralised skarn lithologies generally sampled.
•
IVR 2023 core was oriented on site by IVR geologists, and a cut line applied to ensure consistent
sampling of core from one side occurred.
•
All IVR 2023 diamond drill core samples were marked up onsite by geologists and field
technicians and collected by cutting the core longitudinally in half using a diamond core saw. If
13
Criteria and JORC Code explanation
• Aspects of the determination of
mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has
been done this would be relatively simple
(e.g. ‘RC drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In
other cases more explanation may be
required, such as where there is coarse gold
that has inherent sampling problems.
Unusual commodities or mineralisation
types (e.g. submarine nodules) may warrant
disclosure of detailed information.
Commentary
an orientation line was present the core was cut to preserve the orientation line. If an orientation
line was not present the core was marked with a cut line in order to provide the most
representative uniform and unbiased down hole sample.
•
Historic orientation of core occurred sporadically with Tennant Creek Gold (TCG) orientating 5
geotechnical holes in 2005 (TMDH001-005). However, majority of previous diamond drilling is
not orientated.
•
Historic core was longitudinally cut or split sampled and sent for analysis.
•
2023 IVR duplicate pair analyses were undertaken by ¼ core paired interval samples every 20th
sample in program.
•
Historic (pre-IVR) core was generally ½ core sampled with exception of duplicate pair analyses
which were ¼ core paired interval samples for drilling 2011 onwards.
•
Historic core drilled pre 2004 has no survey or Quality Assurance or Quality Control (QA/QC)
information and as such has not been incorporated in this or previous MRE’s.
•
All core samples were processed by laboratories using industry standard methods including
crushing and pulverising prior to analysis.
•
Visual confirmation of mineralisation was undertaken utilising UV light for Tungsten, but not
relied upon for resource estimation.
•
2023 IVR program core was cut utilising an automatic core saw. Historically, core was either half
split utilising a chisel or utilising a manual core saw.
•
Magnetic Susceptibility sampling utilised a KT10 meter that had been calibrated prior to the
program.
•
Portable XRF was only used for mineral identification and not relied on for assay data.
•
Scintillometer readings were taken for the first 3 drillholes in the 2023 program to confirm that no
radioactive hazards existed as part of the program.
•
Sample specific gravity analysis was by wet/dry Archimedes method of analysis using a
calibrated and certifie